Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
20storm overflows within 2 km
1,949hours of spills in 2025 between them (typical neighbourhood: about 36)
503spill events counted
Yorkshire Water
Rodley Storm Tank Siteinto River Aire74 spills, 965 hours in 2025
60 planned, approved or being built and 6 running (7 MW between them). Those within 5 km are on the map above.
Rooftop solar
West Specialist Inclusive Learning Centre, Town Street - Solar PV PanelsApproved, not yet built · 240 kW
Jun 2024 450 m away
Rooftop solar
Spring Valley Mills - Solar PanelsApproved, not yet built · 380 kW
Apr 2022 650 m away
Rooftop solar
Bramley Baths, Broad Lane - Solar PanelsApproved, not yet built · 430 kW
Dec 2024 1.7 km away
Rooftop solar
Pudsey Leisure Centre - Solar PanelsApproved, not yet built · 250 kW
Feb 2024 1.8 km away
Rooftop solar
Crawshaw Academy, Robin Lane - Solar PanelsApproved, not yet built · 200 kW
May 2023 2.1 km away
Rooftop solar
New Street Mills, Carlisle Road - Solar PanelsApproved, not yet built
Oct 2025 2.5 km away
Rooftop solar
Greenhill Primary School, Gamble Hill Drive - Solar PV panelsApproved, not yet built · 160 kW
May 2023 3.1 km away
Rooftop solar
St Marys Hospital, Green Hill Road - Solar PanelsPlanning application in · 180 kW
Jun 2026 3.6 km away
Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024 3.7 km away
Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024 3.8 km away
Rooftop solar
Road and street works within 1 km
6 permitted works running now or planned, 3 of them major.
Major
Bagley Lane, PudseyUtility asset works · YORKSHIRE WATER · Two-way signals
Oct 2026 to Jun 2027 550 m away
Major, planned
Town Street, PudseyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Two-way signals
Oct 2026 to Oct 2026 600 m away
Major
Town Street, PudseyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Two-way signals
Oct 2026 to Oct 2026 600 m away
Standard
Half Mile, PudseyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Oct 2026 to Nov 2026 300 m away
Standard
Church Hill Gardens, PudseyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Jan 2027 to Jan 2027 600 m away
Minor
Newlands, PudseyUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 26.8 km away
Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation
decided Mar 2024 27.3 km away
Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 27.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Farsley South, Stanningley & Pudsey North West: +30% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.