131new homes completed within 2 km, last 2 years
23homes given permission on brownfield sites since 2021
+6.8%like-for-like prices in Morley Central, 2024 → 2025 (council +3.8%)
+2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
550 m away - New homes
5 new homes completedhouses · Nov 2025 – Apr 2026
Apr 2026
850 m away - New homes
12 new homes completedhouses · Nov 2025 – Apr 2026
Apr 2026
800 m away - New homes
7 new homes completedhouses · Jul 2025 – Feb 2026
Feb 2026
950 m away - New homes
23 new homes completedhouses · Oct 2024 – Nov 2025
Nov 2025
900 m away - New homes
17 new homes completedhouses · May 2025 – Oct 2025
Oct 2025
1000 m away - New homes
17 new homes completedhouses · Feb 2025 – Oct 2025
Oct 2025
1000 m away - New homes
7 new homes completedflats · Sep 2025
Sept 2025
1.2 km away - New homes
8 new homes completedflats · Sep 2025
Sept 2025
500 m away - Planning permissionMar 2022
700 m away - Planning permission
28homes extended 2021–2025, typically adding 26 m²
55since energy certificates began (2008)
1in LS27 8NA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
333hours of spills in 2025 between them (typical neighbourhood: about 36)
134spill events counted
- Yorkshire Water
St Bernards Mill No 2 Csointo Farnley Wood Beck49 spills, 145 hours in 2025
2.0 km away - Yorkshire Water
Dewsbury Road 51 No2 Csointo Cotton Mill Beck50 spills, 119 hours in 2025
1.6 km away - Yorkshire Water
Rooms Lane No 2 Csointo Clvrtd Trib Of Dean Beck30 spills, 66 hours in 2025
1.8 km away - Yorkshire Water
Churwell Hill Csointo Farnley Wood Beck5 spills, 3 hours in 2025
1.9 km away - Yorkshire Water
Yorkshire Water Authority Storm Oveinto Cotton Mill Beck0 spills, 0 hours in 2025
1.2 km away - Yorkshire Water
Gelderd Road Csointo Trib Of Dean Beck0 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
60 planned, approved or being built and 9 running (27 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Stone Pits Lane, MorleyApproved, not yet built
Mar 2021
1.8 km away - Rooftop solar
Unit S, Gildersome Spur, Gildersome - Solar PanelsApproved, not yet built · 150 kW
Oct 2022
1.9 km away - Rooftop solar
Gildersome Spur - Solar PV PanelsApproved, not yet built · 160 kW
Oct 2022
2.0 km away - Rooftop solar
Gelderd Road, Gildersome - Solar PV PanelsApproved, not yet built · 210 kW
Feb 2022
2.0 km away - Solar farm
Howden Clough Landfill, Howden Clough Road - Solar FarmPlanning application in · 2 MW
Jan 2026
2.3 km away - Battery storage
Former Howden Clough, Howden Clough Road - Battery UnitsApproved, not yet built · 2 MW
Apr 2023
2.3 km away - Rooftop solar
Cockburn School, Gipsy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Nov 2025
2.7 km away - Battery storage
Gelderd Road, Beeston - Battery StorageApproved, not yet built
Jul 2023
3.1 km away - Rooftop solar
Network House, Beeston - Solar PanelsApproved, not yet built · 410 kW
Jan 2024
3.8 km away - Rooftop solar
Leeds West, Gelderd Lane - Solar PanelsApproved, not yet built · 770 kW
Apr 2026
3.8 km away - Rooftop solar
Road and street works within 1 km
15 permitted works running now or planned, 3 of them major.
- Major
Florence Terrace, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Feb 2027 to Feb 2027
750 m away - Major
Fountain Street, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Apr 2027 to Apr 2027
950 m away - Major
Westwood Side, MorleyHighway repair and maintenance works · LEEDS CITY COUNCIL · Road closure
Nov 2026 to Nov 2026
1000 m away - Standard
Wellington Street, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Mar 2027 to Mar 2027
550 m away - Standard
Ingle Grove, MorleyNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Jan 2027 to Jan 2027
700 m away - Standard
South Street, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Feb 2027 to Feb 2027
700 m away - Standard
Middleton Road, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Two-way signals
Feb 2027 to Feb 2027
700 m away - Standard
Airedale Terrace, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Feb 2027 to Feb 2027
700 m away - Standard
Corporation Street, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Feb 2027 to Mar 2027
800 m away
Major infrastructure projects within 30 km
- Decideddecided Oct 2015
20.7 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
20.7 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
21.2 km away - Decideddecided Mar 2015
24.5 km away - Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation decided Mar 2024
27.0 km away - Examination
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
23 - 25 Morley Mill, Commercial Street, Morley (full planning permission)
Jan 2022
450 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
J J Food Service, Middleton Grove - Solar Pv PanelsApproved, not yet built · 340 kW
Sept 2023
3.9 km away
Rooftop solarSharp Lane Primary School, Sharp Lane - Solar PanelsApproved, not yet built · 210 kW
Jun 2023
4.6 km away Running nearest: Soothills Landfill (landfill gas, 3.5 km); Haigh Hall Solar Farm (solar farm, 4.5 km); TF and JH Braime Holdings Factory (rooftop solar, 5.9 km); LVF Packaging - Solar Panel (rooftop solar, 6.0 km); Knostrop WWTW AD (anaerobic digestion, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Wynyard Drive, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Feb 2027 to Mar 2027
800 m away
StandardScatcherd Lane, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Feb 2027 to Mar 2027
800 m away StandardChartists Way, MorleyUtility repair and maintenance works · NORTHERN GAS NETWORKS · Some carriageway incursion
Apr 2027 to Apr 2027
900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire.
application due in February 2026
27.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.