What's changing near LS27 7PN
Within 2 km, around Churwell in Leeds. Building, planning, schools, transport, prices and crime.
125new homes completed within 2 km, last 2 years
23homes given permission on brownfield sites since 2021
+7.0%like-for-like prices in Churwell, 2024 → 2025 (council +3.8%)
+4%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
500 m away - New homes
5 new homes completedhouses · Nov 2025 – Apr 2026
Apr 2026
450 m away - New homes
12 new homes completedhouses · Nov 2025 – Apr 2026
Apr 2026
450 m away - New homes
7 new homes completedhouses · Jul 2025 – Feb 2026
Feb 2026
350 m away - New homes
23 new homes completedhouses · Oct 2024 – Nov 2025
Nov 2025
250 m away - New homes
17 new homes completedhouses · May 2025 – Oct 2025
Oct 2025
300 m away - New homes
17 new homes completedhouses · Feb 2025 – Oct 2025
Oct 2025
200 m away - New homes
8 new homes completedflats · Sep 2025
Sept 2025
1.5 km away - Planning permissionMar 2022
1.0 km away - Planning permissionJan 2022
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 34 m²
24since energy certificates began (2008)
0in LS27 7PN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
539hours of spills in 2025 between them (typical neighbourhood: about 36)
231spill events counted
- Yorkshire Water
St Bernards Mill No 2 Csointo Farnley Wood Beck49 spills, 145 hours in 2025
1.2 km away - Yorkshire Water
Dewsbury Road 51 No2 Csointo Cotton Mill Beck50 spills, 119 hours in 2025
1.6 km away - Yorkshire Water
Dean Beck Csointo Farnley Wood Beck38 spills, 98 hours in 2025
1.6 km away - Yorkshire Water
Millshaw No. 2 Csointo Mill Shaw Beck37 spills, 95 hours in 2025
1.4 km away - Yorkshire Water
Rooms Lane No 2 Csointo Clvrtd Trib Of Dean Beck30 spills, 66 hours in 2025
1.1 km away - Yorkshire Water
Yws Unknown Sites Defaultinto Millshaw Beck22 spills, 14 hours in 2025
1.4 km away - Yorkshire Water
Churwell Hill Csointo Farnley Wood Beck5 spills, 3 hours in 2025
1.0 km away - Yorkshire Water
Yorkshire Water Authority Storm Oveinto Cotton Mill Beck0 spills, 0 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
63 planned, approved or being built and 10 running (32 MW between them). Those within 5 km are on the map above.
- Battery storage
Gelderd Road, Beeston - Battery StorageApproved, not yet built
Jul 2023
2.0 km away - Rooftop solar
Gelderd Road, Gildersome - Solar PV PanelsApproved, not yet built · 210 kW
Feb 2022
2.3 km away - Rooftop solar
Stone Pits Lane, MorleyApproved, not yet built
Mar 2021
2.3 km away - Rooftop solar
Gildersome Spur - Solar PV PanelsApproved, not yet built · 160 kW
Oct 2022
2.3 km away - Rooftop solar
Unit S, Gildersome Spur, Gildersome - Solar PanelsApproved, not yet built · 150 kW
Oct 2022
2.4 km away - Rooftop solar
Cockburn School, Gipsy Lane - Solar PV PanelsApproved, not yet built · 430 kW
Nov 2025
2.4 km away - Rooftop solar
Leeds West, Gelderd Lane - Solar PanelsApproved, not yet built · 770 kW
Apr 2026
2.8 km away - Battery storage
Former Howden Clough, Howden Clough Road - Battery UnitsApproved, not yet built · 2 MW
Apr 2023
2.9 km away - Solar farm
Howden Clough Landfill, Howden Clough Road - Solar FarmPlanning application in · 2 MW
Jan 2026
3.0 km away - Rooftop solar
Network House, Beeston - Solar PanelsApproved, not yet built · 410 kW
Jan 2024
3.3 km away - Rooftop solar
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major
Westwood Side, MorleyHighway repair and maintenance works · LEEDS CITY COUNCIL · Give and take
Oct 2026 to Oct 2026
250 m away - Major
Westwood Side, MorleyHighway repair and maintenance works · LEEDS CITY COUNCIL · Road closure
Nov 2026 to Nov 2026
300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2015
20.8 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
20.8 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
21.3 km away - Decideddecided Mar 2015
24.6 km away - Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation decided Mar 2024
26.2 km away - Examination
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Soothills Landfill (landfill gas, 4.6 km); TF and JH Braime Holdings Factory (rooftop solar, 5.1 km); LVF Packaging - Solar Panel (rooftop solar, 5.2 km); Haigh Hall Solar Farm (solar farm, 5.5 km); Knostrop WWTW AD (anaerobic digestion, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.