What's changing near LS23 6JQ
Within 2 km, around Boston Spa & Bramham in Leeds. Building, planning, schools, transport, prices and crime.
1new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+5.5%like-for-like prices in Boston Spa & Bramham, 2024 → 2025 (council +3.8%)
+2%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 25 m²
13since energy certificates began (2008)
0in LS23 6JQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
79hours of spills in 2025 between them (typical neighbourhood: about 36)
35spill events counted
- Yorkshire Water
Ebor Way Csointo River Wharfe26 spills, 70 hours in 2025
1.9 km away - Yorkshire Water
Bramham Low Way Csointo Carr Beck9 spills, 9 hours in 2025
1000 m away - Yorkshire Water
Yorkshire Water Churwell Surface Winto Farnley Wood Beck0 spills, 0 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
14 planned, approved or being built and 2 running (11 MW between them). Those within 5 km are on the map above.
- Battery storage
Warren Lane, Bramham - Battery Energy StorageApproved, not yet built · 35 MW
Jul 2025
2.6 km away - Rooftop solar
British Library, Thorp Arch Estate -Solar PanelsApproved, not yet built · 430 kW
Feb 2025
3.8 km away - Rooftop solar
The British Library Building, Boston Spa - Solar PV EquipmentApproved, not yet built · 210 kW
Feb 2025
3.8 km away - Biomass
Wetherby Skip Services - Biomass BoilerApproved, not yet built · 1 MW
Dec 2022
5.2 km away - Solar farm
Hayton House Farm - Solar FarmPlanning application in · 50 MW
May 2025
5.3 km away - Battery storage
Hayton House Farm - Battery StoragePlanning application in
May 2025
5.3 km away - Solar farm
Moto Wetherby Motorway Service Area, Deighton Gates Roundabout - Solar FarmApproved, not yet built · 7 MW
Aug 2024
6.4 km away - Solar farm
Harrogate Road - Solar PanelsApproved, not yet built · 160 kW
Sept 2022
7.7 km away - Rooftop solar
J Revis & Sons, South Field Lane - Solar PV SystemApproved, not yet built · 500 kW
Mar 2023
7.9 km away - Rooftop solar
Hornington Manor, Oxton Lane - Solar panelsApproved, not yet built · 370 kW
Feb 2025
9.4 km away
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation decided Mar 2024
5.1 km away - Decideddecided Oct 2015
19.2 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
19.3 km away - Examination
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire. application due in February 2026
19.8 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wothersome Grange Farm House AD - crops (anaerobic digestion, 3.1 km); Hook Moor (wind farm, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.