What's changing near LS22 6JS
Within 2 km, around Wetherby East & Thorp Arch in Leeds. Building, planning, schools, transport, prices and crime.
36new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-2.3%like-for-like prices in Wetherby East & Thorp Arch, 2024 → 2025 (council +3.8%)
-15%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 25 m²
17since energy certificates began (2008)
0in LS22 6JS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
393hours of spills in 2025 between them (typical neighbourhood: about 36)
75spill events counted
- Yorkshire Water
Wetherby Sewage Treatment Worksinto River Wharfe · near bathing water: Wharfe at Wilderness Carpark50 spills, 363 hours in 2025
1.7 km away - Yorkshire Water
Scott Lane Csointo River Wharfe · near bathing water: Wharfe at Wilderness Carpark20 spills, 23 hours in 2025
750 m away - Yorkshire Water
Wetherby Bypass Csointo River Wharfe · near bathing water: Wharfe at Wilderness Carpark4 spills, 7 hours in 2025
850 m away - Yorkshire Water
Weatherby High Street Csointo River Wharfe · near bathing water: Wharfe at Wilderness Carpark1 spills, 0 hours in 2025
650 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
9 planned, approved or being built and 1 running (1 MW between them). Those within 5 km are on the map above.
- Solar farm
Moto Wetherby Motorway Service Area, Deighton Gates Roundabout - Solar FarmApproved, not yet built · 7 MW
Aug 2024
1.9 km away - Biomass
Wetherby Skip Services - Biomass BoilerApproved, not yet built · 1 MW
Dec 2022
2.7 km away - Solar farm
Harrogate Road - Solar PanelsApproved, not yet built · 160 kW
Sept 2022
3.4 km away - Rooftop solar
British Library, Thorp Arch Estate -Solar PanelsApproved, not yet built · 430 kW
Feb 2025
4.0 km away - Rooftop solar
The British Library Building, Boston Spa - Solar PV EquipmentApproved, not yet built · 210 kW
Feb 2025
4.0 km away - Rooftop solar
J Revis & Sons, South Field Lane - Solar PV SystemApproved, not yet built · 500 kW
Mar 2023
5.5 km away - Solar farm
Harrogate South Waste Water Treatment Works - Ground Mounted Solar ArrayApproved, not yet built · 370 kW
Jun 2023
5.7 km away - Battery storage
Warren Lane, Bramham - Battery Energy StorageApproved, not yet built · 35 MW
Jul 2025
7.3 km away - Rooftop solar
Flaxby Moor Works, Flaxby - Solar Photovoltaic PanelsApproved, not yet built · 160 kW
Sept 2021
8.2 km away
Running nearest: Wothersome Grange Farm House AD - crops (anaerobic digestion, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major
Privas Way, WetherbyHighway improvement works · LEEDS CITY COUNCIL · Road closure
Oct 2026 to Nov 2026
850 m away - Minor
Netherdale Court, WetherbyUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
350 m away - Minor
Westgate, WetherbyPermanent reinstatement · QUICKLINE COMMUNICATIONS LTD · Multi-way signals
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation decided Mar 2024
7.5 km away - Decideddecided Oct 2015
24.0 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
24.2 km away - Examination
Light Valley SolarGenerating Stations · The Proposed Development includes seven land parcels (Sites 1-4 and 6-8) which are strategically situated in the rural expanse between Monk Fryston and Hillam, Hambleton and Escrick. Site 1 is the northernmost parcel, part of the Escrick Estate and is approximately 430m east of Escrick. The western parcels (Sites 2, 6, 7 and 8) situated to the east of South Milford and north-east of Monk Fryston are located close to the Milford Curve rail line and are characterised by arable landscape dotted with farm structures. The southern most parcels (Sites 3 and 4) are also characterised by arable landscape and are located to the east of Monk Fryston; with Site 4 being located just east of Birkin, on the northern edge of the River Aire. application due in February 2026
24.5 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.