What's changing near LS19 7AX
Within 2 km, around Yeadon East in Leeds. Building, planning, schools, transport, prices and crime.
10new homes completed within 2 km, last 2 years
74homes given permission on brownfield sites since 2021
+2.0%like-for-like prices in Yeadon East, 2024 → 2025 (council +3.8%)
+11%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 25 m²
14since energy certificates began (2008)
1in LS19 7AX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
35 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Benton Park School, Harrogate Road - Solar PanelsApproved, not yet built · 230 kW
Aug 2023
1.3 km away - Rooftop solar
Guiseley Primary School, Oxford Road - Solar PanelsApproved, not yet built · 200 kW
Jul 2024
2.9 km away - Rooftop solar
Guiseley School, Fieldhead Road - Solar PanelsApproved, not yet built · 270 kW
May 2023
3.1 km away - Rooftop solar
Silvine Works - Roof Mounted Solar PanelsApproved, not yet built · 240 kW
Jan 2022
4.8 km away - Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024
4.9 km away - Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022
5.5 km away - Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023
5.5 km away - Rooftop solar
Wharfedale General Hospital - Solar Photovoltaic PanelsApproved, not yet built · 470 kW
Dec 2021
5.7 km away - Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023
5.9 km away - Rooftop solar
Bramley Baths, Broad Lane - Solar PanelsApproved, not yet built · 430 kW
Dec 2024
6.1 km away
Road and street works within 1 km
3 permitted works running now or planned.
- Standard
Moorfield Close, LeedsUtility repair and maintenance works · NORTHERN GAS NETWORKS · Multi-way signals
Mar 2027 to Mar 2027
200 m away - Standard
East View, LeedsUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Mar 2027 to Apr 2027
550 m away - Standard
Windmill Lane, LeedsNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Dec 2026 to Dec 2026
700 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire. application due November 2026
26.1 km away - Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation decided Mar 2024
26.2 km away - Decideddecided Oct 2015
29.9 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
30.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Esholt WWTW (other, 3.5 km); Morrisons, Bradford Road, Idle - Solar PV Panels (rooftop solar, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.