Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
811hours of spills in 2025 between them (typical neighbourhood: about 36)
103spill events counted
Yorkshire Water
Woodlands Close Csointo River Aire54 spills, 680 hours in 2025
1.9 km away
Yorkshire Water
Woodlands Drive Csointo River Aire31 spills, 94 hours in 2025
43 planned, approved or being built and 2 running (4 MW between them). Those within 5 km are on the map above.
Rooftop solar
Benton Park School, Harrogate Road - Solar PanelsApproved, not yet built · 230 kW
Aug 2023 200 m away
Rooftop solar
Guiseley School, Fieldhead Road - Solar PanelsApproved, not yet built · 270 kW
May 2023 2.9 km away
Rooftop solar
Guiseley Primary School, Oxford Road - Solar PanelsApproved, not yet built · 200 kW
Jul 2024 3.0 km away
Rooftop solar
Sainsburys - Solar PanelsApproved, not yet built · 310 kW
Sept 2024 3.6 km away
Rooftop solar
Sapper Jordan Rossi Park, Baildon - Solar PanelsApproved, not yet built · 300 kW
Oct 2022 4.5 km away
Rooftop solar
Baildon CE Primary School, Coverdale Way - Solar Photovoltaic PanelsApproved, not yet built · 170 kW
Dec 2023 4.7 km away
Rooftop solar
Marston House, Otley Road - Solar PanelsApproved, not yet built · 3 MW
May 2023 4.9 km away
Other
Bradford Low Carbon HydrogenApproved, not yet built
Apr 2024 5.3 km away
Rooftop solar
Bramley Baths, Broad Lane - Solar PanelsApproved, not yet built · 430 kW
Dec 2024 5.4 km away
Rooftop solar
West Specialist Inclusive Learning Centre, Town Street - Solar PV PanelsApproved, not yet built · 240 kW
Jun 2024 5.5 km away
Road and street works within 1 km
7 permitted works running now or planned, 1 of them major.
Major
Green Lane, LeedsUtility repair and maintenance works · YORKSHIRE WATER · Multi-way signals
Sept 2026 to Oct 2026 350 m away
Standard
Markham Crescent, LeedsNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Nov 2026 to Nov 2026 300 m away
Standard
Greenacre Park Avenue, LeedsNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Give and take
Nov 2026 to Nov 2026 350 m away
Standard
Leeds Road, LeedsUtility asset works · YORKSHIRE WATER · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away
Standard
New Road, LeedsUtility repair and maintenance works · YORKSHIRE WATER · Lane closure
Nov 2026 to Nov 2026 600 m away
Standard
Windmill Lane, LeedsNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · Some carriageway incursion
Dec 2026 to Dec 2026 650 m away
Standard
East View, LeedsUtility repair and maintenance works · NORTHERN GAS NETWORKS · Road closure
Mar 2027 to Apr 2027 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 25.2 km away
Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Yeadon South: +23% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.9% in two years.