Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
680hours of spills in 2025 between them (typical neighbourhood: about 36)
193spill events counted
Yorkshire Water
Hough Side Works Csointo Farnley Beck86 spills, 540 hours in 2025
800 m away
Yorkshire Water
Lowtown Csointo Clvrtdtrib Of Pudsey Beck37 spills, 52 hours in 2025
1.4 km away
Yorkshire Water
Farnley Ring Road Csointo Farnley Beck22 spills, 40 hours in 2025
400 m away
Yorkshire Water
Houghside Road Csointo Tributary Of Pudesy Beck22 spills, 27 hours in 2025
1.2 km away
Yorkshire Water
Kent Road Csointo Tributary Of Pudsey Beck17 spills, 18 hours in 2025
1.6 km away
Yorkshire Water
Stonebridge Lane Csointo Farnley Beck6 spills, 2 hours in 2025
1.4 km away
Yorkshire Water
Pudsey Valley Road Csointo Tributary Of Pudsey Beck3 spills, 1 hours in 2025
1.2 km away
Yorkshire Water
Swinnow View Csointo Farnley Beck0 spills, 0 hours in 2025
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M).
application due February 2028 24.4 km away
Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council.
application due June 2027 25.0 km away
Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation
decided Mar 2024 26.0 km away
Pre-application
Calderdale Energy ParkGenerating Stations · Walshaw Moor, on either side of the three Walshaw Dean Reservoirs in the Metropolitan Borough of Calderdale, West Yorkshire.
application due November 2026 27.7 km away
Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Pudsey North East: +30% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.5% in two years.
Generating Stations · Former Oxiris Chemical Works, Knottingley
decided Mar 2015 28.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.