What's changing near LS12 5FB
Within 2 km, around Farnley West & Gamble Hill in Leeds. Building, planning, schools, transport, prices and crime.
30new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+6.1%like-for-like prices in Farnley West & Gamble Hill, 2024 → 2025 (council +3.8%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completed4 flats, 6 houses · Nov 2024 – Aug 2025
Aug 2025
100 m away - New homes
10 new homes completedhouses · Oct 2024 – Mar 2025
Mar 2025
100 m away - New homes
5 new homes completedhouses · Oct 2024 – Jan 2025
Jan 2025
150 m away - New schoolMar 2022
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
3homes extended 2021–2025, typically adding 32 m²
13since energy certificates began (2008)
0in LS12 5FB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
570hours of spills in 2025 between them (typical neighbourhood: about 36)
217spill events counted
- Yorkshire Water
Dale Farm No2 Csointo Ringshaw Beck59 spills, 197 hours in 2025
1.7 km away - Yorkshire Water
St Bernards Mill No 2 Csointo Farnley Wood Beck49 spills, 145 hours in 2025
1.5 km away - Yorkshire Water
Dean Beck Csointo Farnley Wood Beck38 spills, 98 hours in 2025
1.2 km away - Yorkshire Water
Rooms Lane No 2 Csointo Clvrtd Trib Of Dean Beck30 spills, 66 hours in 2025
1.6 km away - Yorkshire Water
Wellfield Terrace Csointo Trib Of Farnley Wood Beck37 spills, 63 hours in 2025
1.4 km away - Yorkshire Water
Yws Unknown Sites Defaultinto Trib Of Wortley Beck4 spills, 1 hours in 2025
600 m away - Yorkshire Water
Gelderd Road Csointo Trib Of Dean Beck0 spills, 0 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
62 planned, approved or being built and 11 running (31 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Gelderd Road, Gildersome - Solar PV PanelsApproved, not yet built · 210 kW
Feb 2022
2.3 km away - Rooftop solar
Gildersome Spur - Solar PV PanelsApproved, not yet built · 160 kW
Oct 2022
2.5 km away - Rooftop solar
Unit S, Gildersome Spur, Gildersome - Solar PanelsApproved, not yet built · 150 kW
Oct 2022
2.7 km away - Rooftop solar
Stone Pits Lane, MorleyApproved, not yet built
Mar 2021
2.7 km away - Rooftop solar
Greenhill Primary School, Gamble Hill Drive - Solar PV panelsApproved, not yet built · 160 kW
May 2023
2.9 km away - Rooftop solar
Crawshaw Academy, Robin Lane - Solar PanelsApproved, not yet built · 200 kW
May 2023
2.9 km away - Battery storage
Gelderd Road, Beeston - Battery StorageApproved, not yet built
Jul 2023
2.9 km away - Rooftop solar
St Marys Hospital, Green Hill Road - Solar PanelsPlanning application in · 180 kW
Jun 2026
3.1 km away - Rooftop solar
New Street Mills, Carlisle Road - Solar PanelsApproved, not yet built
Oct 2025
3.2 km away - Rooftop solar
Pudsey Leisure Centre - Solar PanelsApproved, not yet built · 250 kW
Feb 2024
3.4 km away - Rooftop solar
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2015
23.3 km away - Pre-application
Ferrybridge Carbon Capture and StorageOther Pipe-lines · The Ferrybridge Energy from Waste Carbon Capture and Storage project is located near Knottingley within the City of Wakefield in West Yorkshire and administrative area of the Wakefield Metropolitan DC. The site is located to the west of the River Aire and the east of the A1(M). application due February 2028
23.3 km away - Pre-application
Ferrybridge Next Generation Power StationGenerating Stations · Land at and within the vicinity of the former Ferrybridge C Power Station Site, Kirkhaw Lane, Ferrybridge, Knottingley, West Yorkshire – within the administrative area of Metropolitan District of Wakefield, and a land corridor extending eastwards into the administrative area of North Yorkshire Council. application due June 2027
23.8 km away - Decideddecided Mar 2015
27.1 km away - Decided
Yorkshire GREENElectric Lines · Approximately 2km to the north west of York, extending 36km south to Monk Fryston substation decided Mar 2024
27.2 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Soothills Landfill (landfill gas, 6.4 km); TF and JH Braime Holdings Factory (rooftop solar, 6.5 km); LVF Packaging - Solar Panel (rooftop solar, 6.8 km); Regent Street, Sheepscar - Solar Panels (rooftop solar, 7.1 km); Buslingthorpe Power Station (Leeds North) (biomass, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.