Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
26 planned, approved or being built and 3 running (30 MW between them). Those within 5 km are on the map above.
Battery storage
Potterhill Farm - Battery StorageApproved, not yet built
Jan 2025 1.3 km away
Rooftop solar
Cargill & Frontier Agriculture, Camp Road - Solar PanelsApproved, not yet built · 360 kW
Mar 2023 2.6 km away
Rooftop solar
Swinderby Quarry - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023 2.6 km away
Rooftop solar
Clay Farm, South Scarle Lane - Solar PanelsApproved, not yet built · 550 kW
Feb 2023 2.9 km away
Solar farm
Fosse Green EnergyPlanning application in · 350 MW
Jul 2025 3.7 km away
Battery storage
Fosse Green EnergyPlanning application in
Jul 2025 3.7 km away
Solar farm
Noble Foods, Hives Lane - Solar PanelsApproved, not yet built · 370 kW
Jul 2023 5.0 km away
Solar farm
Whisby Quarry, Eagle Road - Solar ArrayApproved, not yet built · 18 MW
Sept 2025 5.8 km away
Solar farm
Great North Road Solar ParkPlanning application in · 800 MW
Jun 2025 7.5 km away
Battery storage
Great North Road Solar ParkPlanning application in
Jun 2025 7.5 km away
Rooftop solar
Ossington Road, Carlton On Trent- Solar Panels
Road and street works within 1 km
4 permitted works running now or planned, 4 of them major.
Major, planned
Manor Road, SwinderbyUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 100 m away
Major
Manor Road, SwinderbyUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 100 m away
Major, planned
Station Road, SwinderbyUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 750 m away
Major
Station Road, SwinderbyUtility asset works · BT · Road closure
Dec 2026 to Dec 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decision
Fosse Green Energy Generating Stations · The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln
application due 18 July 2025 3.7 km away
Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire
application due December 2028 8.5 km away
Decided
One Earth Solar Farm Generating Stations · Land surrounding the River Trent, north of South Clifton, east of Skegby, west of Thorney.
decided Jul 2026 9.2 km away
Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
High Marnham Power Station, High Marnham - Hydrogen Production PlantApproved, not yet built · 8 MW
Oct 2023 7.8 km away
Running nearest: Lincoln Landfill Scheme (landfill gas, 7.9 km); Lincoln EFW (energy from waste, 8.1 km); JG Pears' animal rendering facility (biomass, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decided
Springwell Solar FarmGenerating Stations · The Site is located within the administrative boundary of North Kesteven District Council and in the County of Lincolnshire.
decided Apr 2026 19.7 km away
Decided
Gate Burton Energy ParkGenerating Stations · The Site is located approximately 4 kilometres (km) south of Gainsborough.
decided Jul 2024 21.4 km away
Decided
Cottam Solar ProjectGenerating Stations · Cottam 1 land parcel located to the east of Willingham by Stow, Normanby by Stow and Stow.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.