Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
89hours of spills in 2025 between them (typical neighbourhood: about 36)
13spill events counted
Anglian Water
Eagle Pumping Stationinto Unnamed Drain13 spills, 89 hours in 2025
22 planned, approved or being built and 3 running (30 MW between them). Those within 5 km are on the map above.
Solar farm
Whisby Quarry, Eagle Road - Solar ArrayApproved, not yet built · 18 MW
Sept 2025 2.5 km away
Rooftop solar
Clay Farm, South Scarle Lane - Solar PanelsApproved, not yet built · 550 kW
Feb 2023 3.2 km away
Solar farm
Noble Foods, Hives Lane - Solar PanelsApproved, not yet built · 370 kW
Jul 2023 3.6 km away
Battery storage
Potterhill Farm - Battery StorageApproved, not yet built
Jan 2025 3.7 km away
Rooftop solar
Cargill & Frontier Agriculture, Camp Road - Solar PanelsApproved, not yet built · 360 kW
Mar 2023 5.1 km away
Rooftop solar
Swinderby Quarry - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023 5.1 km away
Solar farm
Fosse Green EnergyPlanning application in · 350 MW
Jul 2025 5.5 km away
Battery storage
Fosse Green EnergyPlanning application in
Jul 2025 5.5 km away
Rooftop solar
North Kesteven Sports Centre, Moor Lane - Solar PV PanelsApproved, not yet built · 170 kW
Jul 2024 6.0 km away
Solar farm
Ferry Lane, Skellingthorpe - Solar PanelsApproved, not yet built · 20 MW
May 2026 7.3 km away
Wind farm
Trentholme Farm, North Clifton - Wind Turbine
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decision
Fosse Green Energy Generating Stations · The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln
application due 18 July 2025 5.5 km away
Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire
application due December 2028 6.1 km away
Decided
One Earth Solar Farm Generating Stations · Land surrounding the River Trent, north of South Clifton, east of Skegby, west of Thorney.
decided Jul 2026 6.3 km away
Decided
West Burton Solar ProjectGenerating Stations · West Burton 1-3 land parcels located to the south of Sturton by Stow and south east of Marton.
decided Jan 2025 10.8 km away
Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
West Burton C power station Generating Stations · Within the wider West Burton Power station site, approximately 3.5km to the south of Gainsborough
decided Oct 2020 20.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.