What's changing near LN6 9BG
Within 2 km, around Skellingthorpe, Witham & Bassingham in North Kesteven. Building, planning, schools, transport, prices and crime.
1new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.9%like-for-like prices in Skellingthorpe, Witham & Bassingham, 2024 → 2025 (council +2.2%)
+16%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 132 m²
5since energy certificates began (2008)
1in LN6 9BG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 2 running (18 MW between them). Those within 5 km are on the map above.
- Solar farm
Whisby Quarry, Eagle Road - Solar ArrayApproved, not yet built · 18 MW
Sept 2025
1.9 km away - Solar farm
Fosse Green EnergyPlanning application in · 350 MW
Jul 2025
3.0 km away - Battery storage
Fosse Green EnergyPlanning application in
Jul 2025
3.0 km away - Rooftop solar
North Kesteven Sports Centre, Moor Lane - Solar PV PanelsApproved, not yet built · 170 kW
Jul 2024
3.2 km away - Rooftop solar
Cargill & Frontier Agriculture, Camp Road - Solar PanelsApproved, not yet built · 360 kW
Mar 2023
3.3 km away - Rooftop solar
Swinderby Quarry - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023
3.3 km away - Battery storage
Potterhill Farm - Battery StorageApproved, not yet built
Jan 2025
4.7 km away - Rooftop solar
Clay Farm, South Scarle Lane - Solar PanelsApproved, not yet built · 550 kW
Feb 2023
5.4 km away - Battery storage
Sewage Pumping Station, Rookery Lane - Micro Energy StorageApproved, not yet built · 200 kW
Oct 2024
6.3 km away - Solar farm
Noble Foods, Hives Lane - Solar PanelsApproved, not yet built · 370 kW
Jul 2023
6.6 km away - Solar farm
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decision
Fosse Green Energy Generating Stations · The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln application due 18 July 2025
3.0 km away - Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire application due December 2028
9.5 km away - Decided
One Earth Solar Farm Generating Stations · Land surrounding the River Trent, north of South Clifton, east of Skegby, west of Thorney. decided Jul 2026
9.7 km away - Decided
West Burton Solar ProjectGenerating Stations · West Burton 1-3 land parcels located to the south of Sturton by Stow and south east of Marton. decided Jan 2025
12.8 km away - Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent decided Oct 2025
14.9 km away - Decided
Springwell Solar FarmGenerating Stations · The Site is located within the administrative boundary of North Kesteven District Council and in the County of Lincolnshire. decided Apr 202617.2 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lincoln Landfill Scheme (landfill gas, 3.1 km); Lincoln EFW (energy from waste, 3.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.