Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
182hours of spills in 2025 between them (typical neighbourhood: about 36)
17spill events counted
Anglian Water
North Hykeham Water Recycling Centrinto The River Witham17 spills, 182 hours in 2025
27 planned, approved or being built and 5 running (54 MW between them). Those within 5 km are on the map above.
Battery storage
Sewage Pumping Station, Rookery Lane - Micro Energy StorageApproved, not yet built · 200 kW
Oct 2024 1.9 km away
Rooftop solar
North Kesteven Sports Centre, Moor Lane - Solar PV PanelsApproved, not yet built · 170 kW
Jul 2024 2.5 km away
Rooftop solar
Lincoln Bowl, Washingborough Road - Solar PanelsApproved, not yet built · 210 kW
Sept 2024 4.5 km away
Solar farm
Whisby Quarry, Eagle Road - Solar ArrayApproved, not yet built · 18 MW
Sept 2025 6.0 km away
Rooftop solar
Crofton Drive - Solar Photovoltaic PanelsApproved, not yet built · 430 kW
Mar 2025 6.2 km away
Solar farm
Branston Solar Park (extension)Being built · 40 MW
Sept 2019 6.3 km away
Solar farm
Ferry Lane, Skellingthorpe - Solar PanelsApproved, not yet built · 20 MW
May 2026 6.5 km away
Battery storage
Hill Rise, Coleby - Battery Energy StoragePlanning application in · 1,000 MW
May 2025 6.5 km away
Solar farm
Springwell, Lincoln - Springwell Solar Farm & Battery StorageApproved, not yet built · 800 MW
Apr 2026 6.8 km away
Battery storage
Springwell, Lincoln - Springwell Solar Farm & Battery StorageApproved, not yet built
Apr 2026 6.8 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major
Hollywell Road, WaddingtonHighway improvement works · LINCOLNSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Mar 2027 1000 m away
Minor
Orchid Road, LincolnHighway improvement works · LINCOLNSHIRE COUNTY COUNCIL · Give and take
Nov 2026 to Nov 2026 200 m away
Minor
Sidlaw Grove, LincolnDisconnection or alteration of supply · CADENT GAS LIMITED · No carriageway incursion
Oct 2026 to Oct 2026 250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decision
Fosse Green Energy Generating Stations · The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln
application due 18 July 2025 7.2 km away
Decided
Springwell Solar FarmGenerating Stations · The Site is located within the administrative boundary of North Kesteven District Council and in the County of Lincolnshire.
decided Apr 2026 13.6 km away
Decided
West Burton Solar ProjectGenerating Stations · West Burton 1-3 land parcels located to the south of Sturton by Stow and south east of Marton.
decided Jan 2025 13.9 km away
Decided
One Earth Solar Farm Generating Stations · Land surrounding the River Trent, north of South Clifton, east of Skegby, west of Thorney.
decided Jul 2026 14.2 km away
Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire
application due December 2028 14.3 km away
Decided
Cottam Solar ProjectGenerating Stations · Cottam 1 land parcel located to the east of Willingham by Stow, Normanby by Stow and Stow.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Bracebridge South & Swallow Beck: +22% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.1% in two years.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.