Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
433hours of spills in 2025 between them (typical neighbourhood: about 36)
61spill events counted
Anglian Water
Bassingham Water Recycling Centreinto River Witham48 spills, 233 hours in 2025
850 m away
Anglian Water
Swinderby(Exraf) Stwinto Unnamed Tributary River Witham13 spills, 200 hours in 2025
20 planned, approved or being built and 2 running (18 MW between them). Those within 5 km are on the map above.
Solar farm
Fosse Green EnergyPlanning application in · 350 MW
Jul 2025 2.2 km away
Battery storage
Fosse Green EnergyPlanning application in
Jul 2025 2.2 km away
Rooftop solar
Cargill & Frontier Agriculture, Camp Road - Solar PanelsApproved, not yet built · 360 kW
Mar 2023 2.9 km away
Rooftop solar
Swinderby Quarry - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023 2.9 km away
Biomass
Poplar Farm, Lowfields - Biomass BoilerApproved, not yet built · 2 MW
Oct 2022 3.6 km away
Rooftop solar
The Feed Mill, Lowfields - Solar PanelsApproved, not yet built
Mar 2024 4.0 km away
Rooftop solar
Barn Farm, Navenby - Solar PanelsApproved, not yet built · 220 kW
May 2022 4.0 km away
Biomass
Barn Farm Lowfields, Navenby - Biomass boilerApproved, not yet built · 2 MW
Sept 2022 4.0 km away
Rooftop solar
Skinnand Manor Farm, Navenby - Solar panelsApproved, not yet built
May 2022 4.6 km away
Biomass
Skinnand Manor Farm, Parsons Lane - Biomass BoilerBeing built · 2 MW
Feb 2023 4.6 km away
Biomass
Castle Farm, Castle Lane - Biomass Boiler & Agricultural Building
Road and street works within 1 km
2 permitted works running now or planned.
Standard
High Street, BassinghamUtility asset works · BT · No carriageway incursion
Oct 2026 to Oct 2026 550 m away
Minor
Vasey Close, BassinghamHighway improvement works · LINCOLNSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decision
Fosse Green Energy Generating Stations · The Scheme is located in Lincolnshire CC and North Kesteven DC land approximately 9km SW of Lincoln
application due 18 July 2025 2.2 km away
Decided
A46 Newark BypassHighways · From Farndon roundabout to Winthorpe roundabout near Newark-on-Trent
decided Oct 2025 12.5 km away
Pre-application
H2East Pipeline: Humber to NottinghamshireGas Transporter Pipe-lines · Located between North Killingholme and Immingham on the Humber and extending to
Newark in Nottinghamshire, via Scunthorpe in North Lincolnshire, and High Marnham and Kirton in Nottinghamshire
application due December 2028 13.1 km away
Decided
One Earth Solar Farm Generating Stations · Land surrounding the River Trent, north of South Clifton, east of Skegby, west of Thorney.
decided Jul 2026 13.7 km away
Decided
Springwell Solar FarmGenerating Stations · The Site is located within the administrative boundary of North Kesteven District Council and in the County of Lincolnshire.
Boothby Graffoe - Solar photovoltaics panelsApproved, not yet built · 220 kW
May 2022 5.4 km away
Running nearest: Lincoln Landfill Scheme (landfill gas, 7.4 km); Lincoln EFW (energy from waste, 7.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decided
West Burton Solar ProjectGenerating Stations · West Burton 1-3 land parcels located to the south of Sturton by Stow and south east of Marton.
decided Jan 2025 18.0 km away
Decided
Cottam Solar ProjectGenerating Stations · Cottam 1 land parcel located to the east of Willingham by Stow, Normanby by Stow and Stow.
decided Sept 2024 24.4 km away
Decided
Gate Burton Energy ParkGenerating Stations · The Site is located approximately 4 kilometres (km) south of Gainsborough.
decided Jul 2024 24.6 km away
Decided
Beacon Fen Energy ParkGenerating Stations · Site 2.5km N of Heckington and 6.5km NE of Sleaford, connecting to Bicker Fen.
decided Aug 2026 26.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.