Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
1,017hours of spills in 2025 between them (typical neighbourhood: about 36)
194spill events counted
Severn Trent Water
Coalville South Pumping Stationinto River Sence53 spills, 475 hours in 2025
1.1 km away
Severn Trent Water
Donington-Le-Heath Townsend Ln Csointo River Sence74 spills, 294 hours in 2025
Ceva House, Excelsior Road - Solar PanelsPlanning application in · 220 kW
Feb 2025 6.8 km away
Running nearest: Pretoria Road (solar farm, 2.9 km); Crown Farm (solar farm, 4.2 km); Lower Fields Mushroom Farm (solar farm, 4.3 km); Land at Hill Farm (solar farm, 4.3 km); Packington Solar Farm (solar farm, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.