Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
104hours of spills in 2025 between them (typical neighbourhood: about 36)
8spill events counted
Severn Trent Water
Swepstone - Main Street Spsinto Tributary Of Gilwiskaw Brook5 spills, 90 hours in 2025
1.8 km away
Severn Trent Water
Snarestone Road Pumping Stationinto Trib Of River Mease3 spills, 15 hours in 2025
Morrisons, Whitwick Road - Solar PanelsApproved, not yet built · 750 kW
Apr 2022 7.9 km away
Rooftop solar
Laura Ashley, Stanton Under Bardon - Solar panelsApproved, not yet built · 450 kW
Dec 2020 8.0 km away
Running nearest: Packington Solar Farm (solar farm, 3.6 km); Lower Fields Mushroom Farm (solar farm, 4.7 km); Land at Hill Farm (solar farm, 5.3 km); Ashby Solar Farm (a) (solar farm, 5.5 km); Hill Farm - Energy Barn (battery storage, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.