What's changing near LE67 2GJ
Within 2 km, around Hugglescote & Bardon Hill in North West Leicestershire. Building, planning, schools, transport, prices and crime.
685new homes completed within 2 km, last 2 years
33homes given permission on brownfield sites since 2021
+1.0%like-for-like prices in Hugglescote & Bardon Hill, 2024 → 2025 (council +1.5%)
-5%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · Oct 2025 – Oct 2026
Oct 2026
1.3 km away - New homes
16 new homes completedhouses · Apr 2026 – Oct 2026
Oct 2026
700 m away - New homes
13 new homes completedhouses · Nov 2025 – Oct 2026
Oct 2026
1.5 km away - New homes
14 new homes completedhouses · Apr 2026 – Oct 2026
Oct 2026
750 m away - New homes
27 new homes completedhouses · Oct 2024 – Oct 2026
Oct 2026
1.0 km away - New homes
35 new homes completedhouses · Sep 2025 – Oct 2026
Oct 2026
1.6 km away - New homes
9 new homes completedhouses · Mar 2025 – Sep 2026
Sept 2026
1.7 km away - New homes
24 new homes completedhouses · Jan 2025 – Sep 2026
Sept 2026
1.7 km away - New homes
36 new homes completedhouses · Mar 2025 – Sep 2026
Sept 2026
1.8 km away - New homes
15 new homes completedhouses · Oct 2024 – Sep 2026
Sept 2026
1.8 km away - New homes
24 new homes completedhouses · Nov 2025 – Sep 2026
Sept 2026
750 m away - New homes
6 new homes completedhouses · Nov 2024 – Aug 2026
Aug 20261.5 km away
14homes extended 2021–2025, typically adding 19 m²
26since energy certificates began (2008)
2in LE67 2GJ itself
- Extendedcertificate 2023
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
843hours of spills in 2025 between them (typical neighbourhood: about 36)
164spill events counted
- Severn Trent Water
Coalville South Pumping Stationinto River Sence53 spills, 475 hours in 2025
1.8 km away - Severn Trent Water
Donington-Le-Heath Townsend Ln Csointo River Sence74 spills, 294 hours in 2025
900 m away - Severn Trent Water
Coalville - London Road Csointo Tributary Of River Sence12 spills, 25 hours in 2025
1.6 km away - Severn Trent Water
Coalville - Central Road (Cso)into River Sence (Anker)11 spills, 17 hours in 2025
700 m away - Severn Trent Water
Snibston - St Marys Lane Csointo River Sence6 spills, 17 hours in 2025
1.6 km away - Severn Trent Water
Forest Road Csointo River Sence8 spills, 15 hours in 2025
700 m away - Severn Trent Water
Dennis Street Storm Overflowinto River Sence0 spills, 0 hours in 2025
700 m away - Severn Trent Water
Coalville - Jackson Street (Cso)into Drain0 spills, 0 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
18 planned, approved or being built and 21 running (138 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons, Whitwick Road - Solar PanelsApproved, not yet built · 750 kW
Apr 2022
1.6 km away - Rooftop solar
Motability Operations Limited, Stephenson Court - Solar PanelsApproved, not yet built · 280 kW
Apr 2024
2.1 km away - Rooftop solar
Whitwick And Coalville Leisure Centre, Stephenson Way - Solar PanelsApproved, not yet built · 350 kW
Feb 2025
2.3 km away - Rooftop solar
Trans Continental Marketing Limited, Regs Way - Solar PanelsApproved, not yet built · 250 kW
Sept 2025
2.9 km away - Rooftop solar
Gateway House, Interlink Way West - Solar PanelsApproved, not yet built · 570 kW
Jun 2023
3.1 km away - Rooftop solar
Bardon Quarry - Solar PanelsApproved, not yet built · 190 kW
Aug 2024
3.2 km away - Rooftop solar
Laura Ashley, Stanton Under Bardon - Solar panelsApproved, not yet built · 450 kW
Dec 2020
3.4 km away - Rooftop solar
West Lane, Bardon Hill - Solar PV SystemApproved, not yet built · 610 kW
Aug 2021
3.7 km away - Rooftop solar
Mushroom Farm, Lower Fields - Agricultural Building & Solar PanelsApproved, not yet built · 580 kW
Jul 2024
5.0 km away - Rooftop solar
Ceva House, Excelsior Road - Solar PanelsPlanning application in · 220 kW
Feb 20256.3 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major
Forest Road, CoalvilleUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
950 m away - Minor
Standard Hill, CoalvilleRemedial works · LEICESTERSHIRE COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026
500 m away - Minor
Holts Lane, Donington Le HeathHighway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026
500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- RecommendationSept 2026
12.7 km away - Decideddecided Jan 2016
15.1 km away - RecommendationSept 2026
15.1 km away - Decideddecided Mar 2025
18.6 km away - Decideddecided Jun 2025
19.3 km away - Decideddecided Dec 2014
19.4 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Pretoria Road (solar farm, 2.7 km); Green's Lodge Farm (anaerobic digestion, 4.6 km); Land at Hill Farm (solar farm, 4.7 km); Lower Fields Mushroom Farm (solar farm, 5.1 km); Tower Hayes Farm (solar farm, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.