Country England and Wales › Region East Midlands › Council North West Leicestershire › Neighbourhood Ashby de la Zouch North › Postcode LE65 2TE What's changing near LE65 2TE Within 2 km, around Ashby de la Zouch North in North West Leicestershire. Building, planning, schools, transport, prices and crime.
272 new homes completed within 2 km, last 2 years
13 homes given permission on brownfield sites since 2021
+1.1% like-for-like prices in Ashby de la Zouch North, 2024 → 2025 (council +1.5%)
+8% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 28 new homes completed houses · Nov 2024 – Oct 2026
planned Oct 2026 1.7 km away New homes 15 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.5 km away New homes 18 new homes completed houses · Feb 2025 – Sep 2026
Sept 2026 1.8 km away New homes 16 new homes completed houses · May 2025 – Aug 2026
Aug 2026 1.5 km away New homes 27 new homes completed 7 flats, 20 houses · Feb 2025 – Jul 2026
Jul 2026 1.5 km away New homes 26 new homes completed houses · Dec 2024 – Mar 2026
Mar 2026 1.8 km away New school New school: Huntingdon House School Other independent special school, other independent special school
Dec 2025 1.7 km away New homes 12 new homes completed houses · Jul 2025 – Dec 2025
Dec 2025 1.8 km away New homes 23 new homes completed 4 flats, 19 houses · Jul 2025 – Nov 2025
Nov 2025 1.6 km away New homes 32 new homes completed houses · Jan 2025 – Nov 2025
Nov 2025 1.8 km away New homes 21 new homes completed houses · Feb 2025 – Oct 2025
Oct 2025 1.6 km away New homes 10 new homes completed
0 homes extended 2021–2025
0 since energy certificates began (2008)
0 in LE65 2TE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
42 hours of spills in 2025 between them (typical neighbourhood: about 36)
19 spill events counted
Severn Trent Water Blackfordby Cso into Tributary Of Shell Brook 18 spills, 42 hours in 2025
1.7 km away Severn Trent Water Ashby - Bath Grounds Cso into Gilwiskaw Brook 1 spills, 1 hours in 2025
1.9 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 15 planned, approved or being built and 16 running (76 MW between them). Those within 5 km are on the map above.
Rooftop solar Clinitron House, Excelsior Road - Solar Panels Approved, not yet built · 160 kW
May 2026 2.7 km away Rooftop solar Ceva House, Excelsior Road - Solar Panels Planning application in · 220 kW
Feb 2025 2.8 km away Rooftop solar Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels Approved, not yet built · 580 kW
Jul 2024 4.8 km away Solar farm Lullington Solar Park Planning application in · 44 MW
Jul 2025 4.9 km away Battery storage Park Road, Overseal - Battery Storage Facility Approved, not yet built · 50 MW
Jul 2025 5.0 km away Energy from waste Keith Willshee Way - Swadlincote Resource Recovery Park Approved, not yet built · 20 MW
Aug 2025 6.3 km away Battery storage Mount Road, Castle Gresley - Battery Storage Facility Approved, not yet built · 20 MW
Jul 2022 6.9 km away Rooftop solar Motability Operations Limited, Stephenson Court - Solar Panels Approved, not yet built · 280 kW
Apr 2024 7.4 km away Battery storage Breach Farm - Energy Barn Approved, not yet built · 40 MW
Aug 2017 8.1 km away Rooftop solar Mercia Park, Burton Road - Solar PV Panels Approved, not yet built · 1 MW
Mar 2023 8.3 km away Road and street works within 1 km 2 permitted works running now or planned, 2 of them major.
Major, planned Annwell Lane, Ashby De La Zouch Utility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026 900 m away Major Annwell Lane, Ashby De La Zouch Utility repair and maintenance works · SEVERN TRENT WATER · Road closure
Oct 2026 to Oct 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jun 2025 11.4 km away Decided decided Dec 2014 11.7 km away Pre-application Castle Way Energy Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027 11.8 km away Recommendation Sept 2026 13.7 km away Decided decided Jan 2016 15.8 km away Recommendation Sept 2026 15.8 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Whitwick And Coalville Leisure Centre, Stephenson Way - Solar Panels Approved, not yet built · 350 kW
Running nearest: Land at Ingles Hill Farm (solar farm, 0 m); Prestop Park Farm (solar farm, 600 m); Short Hazel Solar Farm (solar farm, 2.6 km); Lount solar farm (solar farm, 3.3 km); Ashby Solar Farm (a) (solar farm, 3.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.