Within 2 km, around Ashby de la Zouch North in North West Leicestershire. Building, planning, schools, transport, prices and crime.
267new homes completed within 2 km, last 2 years
13homes given permission on brownfield sites since 2021
+1.1%like-for-like prices in Ashby de la Zouch North, 2024 → 2025 (council +1.5%)
+8%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
15 new homes completedhouses · Apr 2026 – Oct 2026
Oct 2026
900 m away - New homes
22 new homes completedhouses · Nov 2024 – Oct 2026
Oct 2026
1.1 km away - New homes
18 new homes completedhouses · Feb 2025 – Sep 2026
Sept 2026
1.2 km away - New homes
16 new homes completedhouses · May 2025 – Aug 2026
Aug 2026
900 m away - New homes
27 new homes completed7 flats, 20 houses · Feb 2025 – Jul 2026
Jul 2026
950 m away - New homes
26 new homes completedhouses · Dec 2024 – Mar 2026
Mar 2026
1.2 km away - New school
New school: Huntingdon House SchoolOther independent special school, other independent special school
Dec 2025
1.1 km away - New homes
12 new homes completedhouses · Jul 2025 – Dec 2025
Dec 2025
1.2 km away - New homes
23 new homes completed4 flats, 19 houses · Jul 2025 – Nov 2025
Nov 2025
1.0 km away - New homes
32 new homes completedhouses · Jan 2025 – Nov 2025
Nov 2025
1.3 km away - New homes
21 new homes completedhouses · Feb 2025 – Oct 2025
Oct 2025
1.1 km away - New homes
10 new homes completedhouses · Dec 2024 – Mar 2025
7homes extended 2021–2025, typically adding 30 m²
13since energy certificates began (2008)
0in LE65 2SG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
63hours of spills in 2025 between them (typical neighbourhood: about 36)
5spill events counted
- Severn Trent Water
Ashby - Nottingham Road Spsinto Tributary Of Gilwiskaw Brook4 spills, 62 hours in 2025
1.7 km away - Severn Trent Water
Ashby - Bath Grounds Csointo Gilwiskaw Brook1 spills, 1 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
15 planned, approved or being built and 16 running (76 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Clinitron House, Excelsior Road - Solar PanelsApproved, not yet built · 160 kW
May 2026
2.1 km away - Rooftop solar
Ceva House, Excelsior Road - Solar PanelsPlanning application in · 220 kW
Feb 2025
2.2 km away - Rooftop solar
Mushroom Farm, Lower Fields - Agricultural Building & Solar PanelsApproved, not yet built · 580 kW
Jul 2024
4.3 km away - Solar farm
Lullington Solar ParkPlanning application in · 44 MW
Jul 2025
5.5 km away - Battery storage
Park Road, Overseal - Battery Storage FacilityApproved, not yet built · 50 MW
Jul 2025
5.6 km away - Rooftop solar
Motability Operations Limited, Stephenson Court - Solar PanelsApproved, not yet built · 280 kW
Apr 2024
6.8 km away - Energy from waste
Keith Willshee Way - Swadlincote Resource Recovery ParkApproved, not yet built · 20 MW
Aug 2025
6.9 km away - Battery storage
Mount Road, Castle Gresley - Battery Storage FacilityApproved, not yet built · 20 MW
Jul 2022
7.5 km away - Rooftop solar
Whitwick And Coalville Leisure Centre, Stephenson Way - Solar PanelsApproved, not yet built · 350 kW
Feb 2025
7.8 km away - Rooftop solar
Morrisons, Whitwick Road - Solar PanelsApproved, not yet built · 750 kW
Apr 20228.4 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jun 2025
12.0 km away - Decideddecided Dec 2014
12.0 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
12.2 km away - RecommendationSept 2026
13.4 km away - Decideddecided Jan 2016
15.5 km away - RecommendationSept 2026
15.5 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Land at Ingles Hill Farm (solar farm, 600 m); Prestop Park Farm (solar farm, 1.2 km); Lount solar farm (solar farm, 2.8 km); Short Hazel Solar Farm (solar farm, 3.0 km); Lount/Smoile (landfill gas, 3.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.