Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
63hours of spills in 2025 between them (typical neighbourhood: about 36)
5spill events counted
Severn Trent Water
Ashby - Nottingham Road Spsinto Tributary Of Gilwiskaw Brook4 spills, 62 hours in 2025
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 13.2 km away
Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Mercia Park, Burton Road - Solar PV PanelsApproved, not yet built · 1 MW
Mar 2023 8.8 km away
Battery storage
Mount Road, Castle Gresley - Battery Storage FacilityApproved, not yet built · 20 MW
Jul 2022 8.8 km away
Running nearest: Lount solar farm (solar farm, 1.8 km); Land at Ingles Hill Farm (solar farm, 2.0 km); Hill Farm - Energy Barn (battery storage, 2.3 km); Prestop Park Farm (solar farm, 2.6 km); Lount/Smoile (landfill gas, 2.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.