Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
40hours of spills in 2025 between them (typical neighbourhood: about 36)
12spill events counted
Severn Trent Water
Lutterworth - Fox Inn Csointo River Swift12 spills, 40 hours in 2025
17 planned, approved or being built and 6 running (87 MW between them). Those within 5 km are on the map above.
Rooftop solar
Lutterworth Grammar School, Bitteswell Road - Solar PV SystemApproved, not yet built · 300 kW
Dec 2025 200 m away
Rooftop solar
L and R Storage, C & V Business Park - Solar PanelsApproved, not yet built · 290 kW
Jan 2026 1.0 km away
Rooftop solar
Wellington Parkway - Solar panelsApproved, not yet built · 470 kW
May 2022 2.1 km away
Rooftop solar
Armstrong Logistics, Wellington Parkway - Solar panelsApproved, not yet built · 530 kW
Nov 2023 2.1 km away
Rooftop solar
DP World, Unit 5110, Vulcan Way - Solar PhotovoltaicsApproved, not yet built · 580 kW
Dec 2024 2.6 km away
Battery storage
Swinford Energy Park - Energy Park Facility & Battery StoragePlanning application in · 1,000 MW
Aug 2025 4.6 km away
Rooftop solar
Rugby Motorway Services, Leicester Road - Solar PanelsApproved, not yet built · 400 kW
Apr 2024 6.1 km away
Solar farm
Old Station Yard, Station Road - Solar PanelsPlanning application in · 350 kW
Jun 2024 6.1 km away
Solar farm
Swinford Wind FarmBeing built · 20 MW
Dec 2021 6.3 km away
Rooftop solar
Quartzelec Limited, Castle Mound Way - Solar PanelsApproved, not yet built · 520 kW
Dec 2022 6.3 km away
Road and street works within 1 km
9 permitted works running now or planned, 1 of them major.
Major
Bitteswell Road, LutterworthHighway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 500 m away
Standard
Holly Drive, LutterworthUtility repair and maintenance works · BT · Some carriageway incursion
Nov 2026 to Nov 2026 100 m away
Standard
Larch Drive, LutterworthUtility repair and maintenance works · BT · Give and take
Nov 2026 to Nov 2026 150 m away
Standard
Coventry Road, LutterworthUtility asset works · LAST MILE ELECTRICITY LIMITED (Formerly GLOBAL UTILITY CONNECTIONS) · Two-way signals
Oct 2026 to Oct 2026 650 m away
Minor
Holly Drive, LutterworthUtility repair and maintenance works · BT · No carriageway incursion
Nov 2026 to Nov 2026 200 m away
Minor
Guthlaxton Avenue, LutterworthUtility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 700 m away
Minor
Goscote Drive, LutterworthUtility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026 750 m away
Minor
Goscote Drive, LutterworthUtility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away
Minor
Goscote Drive, LutterworthUtility repair and maintenance works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Lutterworth: +19% over five years (2020 → 2025).
Council tax list: 70 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.6% in two years.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due July 2027 20.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.