Country England and Wales › Region East Midlands › Council Hinckley and Bosworth › Neighbourhood Burbage Sketchley & Stretton › Postcode LE10 2RF What's changing near LE10 2RF Within 2 km, around Burbage Sketchley & Stretton in Hinckley and Bosworth. Building, planning, schools, transport, prices and crime.
165 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+5.2% like-for-like prices in Burbage Sketchley & Stretton, 2024 → 2025 (council +2.8%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 11 new homes completed houses · Jun 2025 – Oct 2026
Oct 2026 1.8 km away New homes 28 new homes completed houses · Nov 2024 – Oct 2026
Oct 2026 1.3 km away New homes 21 new homes completed houses · Mar 2025 – Aug 2026
Aug 2026 1.1 km away New homes 5 new homes completed houses · Aug 2025 – Aug 2026
Aug 2026 150 m away New homes 24 new homes completed houses · Aug 2025 – Jul 2026
Jul 2026 1.4 km away New homes 20 new homes completed houses · Jul 2025 – Jun 2026
Jun 2026 1.5 km away New homes 10 new homes completed houses · Jun 2025
Jul 2025 1.1 km away New homes 15 new homes completed 4 flats, 11 houses · Jun 2025
Jun 2025 1.0 km away New homes 8 new homes completed houses · Mar 2025 – Jun 2025
Jun 2025 1.4 km away New homes 6 new homes completed flats · Nov 2024
Nov 2024 1.7 km away New school Aug 2020 1.2 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 21 postcodes nearby had new homes completed in the last two years.
18 homes extended 2021–2025, typically adding 29 m²
28 since energy certificates began (2008)
2 in LE10 2RF itself
Extended certificate 2025 Extended certificate 2024 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 14 storm overflows within 2 km
500 hours of spills in 2025 between them (typical neighbourhood: about 36)
190 spill events counted
Severn Trent Water Hinckley Sewage Treatment Works into Sketchley Brook 42 spills, 318 hours in 2025
1.4 km away Severn Trent Water Burbage - Sapcote Road Cso into Tributary Of Soar Brook 27 spills, 38 hours in 2025
1.7 km away Severn Trent Water Forest Road Cso into Sketchley Brook 32 spills, 34 hours in 2025
900 m away Severn Trent Water Hinckley - Hawley Rd/Station Rd (Cso) into Sketchley Brook 18 spills, 31 hours in 2025
1.2 km away Severn Trent Water Southfield Road Storm Overflow into Sketchley Brook 9 spills, 30 hours in 2025
1.4 km away Severn Trent Water Brookside Hinckley Cso into Sketchley Brook 27 spills, 28 hours in 2025
800 m away Severn Trent Water Burbage - Lychgate Lane (2) (Cso) into River Cam 8 spills, 9 hours in 2025
1.3 km away Severn Trent Water Bullfurlong Lane Cso into Tributary Of Soar Brook 13 spills, 7 hours in 2025
800 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 28 planned, approved or being built and 5 running (18 MW between them). Those within 5 km are on the map above.
Rooftop solar Hinckley Leisure Centre, Argents Mead - Solar Panels Approved, not yet built · 310 kW
Aug 2024 1.4 km away Rooftop solar Dpd International Gateway, Logix Road Phase 1 - Solar Panels Approved, not yet built · 750 kW
Oct 2023 1.7 km away Rooftop solar DPD International Gateway, Logix Road - Phase 2, Solar Panels Approved, not yet built · 500 kW
Apr 2024 2.1 km away Rooftop solar Burbage House - Solar Array Approved, not yet built · 300 kW
Jul 2023 2.1 km away Solar farm Lychgate Lane, Aston Flamville - Solar Farm Being built · 20 MW
Jun 2026 2.5 km away Solar farm E M E B Sports & Social Club, Nutts Lane - Solar Array Approved, not yet built · 300 kW
Nov 2023 2.5 km away Solar farm Elms Farm - Hinckley Solar Farm & Battery Storage Approved, not yet built · 50 MW
Nov 2022 2.6 km away Battery storage Elms Farm - Solar Farm & Battery Storage Approved, not yet built
Nov 2022 2.6 km away Battery storage Hydes Lane, Stretton Baskerville - Battery Storage Approved, not yet built
Jul 2024 3.1 km away Rooftop solar Morrison Supermarkets, Cloverfield - Solar Panels Approved, not yet built · 440 kW
Nov 2022 3.2 km away Road and street works within 1 km 10 permitted works running now or planned, 8 of them major.
Major, planned Rugby Road, Burbage New service connection · Indigo Power · Two-way signals
Oct 2026 to Oct 2026 650 m away Major, planned Herald Way, Burbage New service connection · Indigo Power · Road closure
Oct 2026 to Oct 2026 700 m away Major, planned Rugby Road, Burbage New service connection · Indigo Power · Road closure
Oct 2026 to Nov 2026 750 m away Major, planned Herald Way, Burbage New service connection · Indigo Power · Multi-way signals
Nov 2026 to Nov 2026 800 m away Major, planned Footpath U58, Burbage Highway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 850 m away Major Footpath U58, Burbage Highway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 850 m away Major, planned Newstead Avenue, Burbage Highway improvement works · LEICESTERSHIRE COUNTY COUNCIL · No carriageway incursion
Aug 2026 to Dec 2026 950 m away Major Newstead Avenue, Burbage Highway improvement works · LEICESTERSHIRE COUNTY COUNCIL · No carriageway incursion
Aug 2026 to Dec 2026 950 m away Standard Rugby Road, Burbage New service connection · Indigo Power · Two-way signals
Oct 2026 to Oct 2026 650 m away Minor Major infrastructure projects within 30 km Decided decided Mar 2025 3.6 km away Decided decided Feb 2026 13.8 km away Decided decided Jul 2014 21.6 km away Pre-application Daventry International Rail Freight Terminal Phase 4 (DIRFT 4) Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027 21.9 km away Decided decided May 2020 25.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Basin Bridge Farm (solar farm, 5.3 km); The Stables (solar farm, 6.2 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 7.4 km); Judkins Landfill Site Phase 3 (landfill gas, 8.2 km); Judkins Landfill Scheme (landfill gas, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.