What's changing near LE10 2AH
Within 2 km, around Burbage St Catherines in Hinckley and Bosworth. Building, planning, schools, transport, prices and crime.
200new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+7.1%like-for-like prices in Burbage St Catherines, 2024 → 2025 (council +2.8%)
-12%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
11 new homes completedhouses · Jun 2025 – Oct 2026
Oct 2026
1.6 km away - New homes
28 new homes completedhouses · Nov 2024 – Oct 2026
Oct 2026
1.2 km away - New homes
21 new homes completedhouses · Mar 2025 – Aug 2026
Aug 2026
1.9 km away - New homes
5 new homes completedhouses · Aug 2025 – Aug 2026
Aug 2026
1.0 km away - New homes
24 new homes completedhouses · Aug 2025 – Jul 2026
Jul 2026
1.3 km away - New homes
20 new homes completedhouses · Jul 2025 – Jun 2026
Jun 2026
1.3 km away - New homes
35 new homes completedflats · Jul 2025
Jul 2025
2.0 km away - New homes
10 new homes completedhouses · Jun 2025
Jul 2025
300 m away - New homes
15 new homes completed4 flats, 11 houses · Jun 2025
Jun 2025
250 m away - New homes
8 new homes completedhouses · Mar 2025 – Jun 2025
Jun 2025
1.3 km away - New homes
6 new homes completedflats · Nov 2024
Nov 2024
1.6 km away - New school
9homes extended 2021–2025, typically adding 18 m²
28since energy certificates began (2008)
0in LE10 2AH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
193hours of spills in 2025 between them (typical neighbourhood: about 36)
145spill events counted
- Severn Trent Water
Sapcote-Aston Firs Pumping Stationinto Tributary Of Thurlaston Brook6 spills, 41 hours in 2025
1.2 km away - Severn Trent Water
Burbage - Sapcote Road Csointo Tributary Of Soar Brook27 spills, 38 hours in 2025
850 m away - Severn Trent Water
Forest Road Csointo Sketchley Brook32 spills, 34 hours in 2025
700 m away - Severn Trent Water
Hinckley - Hawley Rd/Station Rd (Cso)into Sketchley Brook18 spills, 31 hours in 2025
1.7 km away - Severn Trent Water
Brookside Hinckley Csointo Sketchley Brook27 spills, 28 hours in 2025
1.2 km away - Severn Trent Water
Burbage - Lychgate Lane (2) (Cso)into River Cam8 spills, 9 hours in 2025
1.0 km away - Severn Trent Water
Bullfurlong Lane Csointo Tributary Of Soar Brook13 spills, 7 hours in 2025
1.4 km away - Severn Trent Water
Banky Meadow Csointo Tributary Of Soar Brook3 spills, 2 hours in 2025
350 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
26 planned, approved or being built and 7 running (23 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Hinckley Leisure Centre, Argents Mead - Solar PanelsApproved, not yet built · 310 kW
Aug 2024
1.5 km away - Solar farm
Lychgate Lane, Aston Flamville - Solar FarmBeing built · 20 MW
Jun 2026
2.0 km away - Rooftop solar
Burbage House - Solar ArrayApproved, not yet built · 300 kW
Jul 2023
2.1 km away - Rooftop solar
Dpd International Gateway, Logix Road Phase 1 - Solar PanelsApproved, not yet built · 750 kW
Oct 2023
2.4 km away - Biomass
Manor Farm, Sharnford Road - Biomass BoilerApproved, not yet built · 290 kW
Jan 2023
2.6 km away - Rooftop solar
DPD International Gateway, Logix Road - Phase 2, Solar PanelsApproved, not yet built · 500 kW
Apr 2024
2.8 km away - Solar farm
E M E B Sports & Social Club, Nutts Lane - Solar ArrayApproved, not yet built · 300 kW
Nov 2023
3.1 km away - Rooftop solar
Morrison Supermarkets, Cloverfield - Solar PanelsApproved, not yet built · 440 kW
Nov 2022
3.1 km away - Solar farm
Elms Farm - Hinckley Solar Farm & Battery StorageApproved, not yet built · 50 MW
Nov 2022
3.3 km away - Battery storage
Elms Farm - Solar Farm & Battery StorageApproved, not yet built
Nov 2022
3.3 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Footpath U58, BurbageHighway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
650 m away - Major
Footpath U58, BurbageHighway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
2.8 km away - Decideddecided Feb 2026
14.6 km away - Decideddecided Jul 2014
21.7 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
22.0 km away - Decideddecided May 2020
26.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Basin Bridge Farm (solar farm, 5.5 km); The Stables (solar farm, 6.1 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 7.8 km); Judkins Landfill Site Phase 3 (landfill gas, 8.8 km); Judkins Landfill Scheme (landfill gas, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.