Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
78hours of spills in 2025 between them (typical neighbourhood: about 36)
64spill events counted
Severn Trent Water
Forest Road Csointo Sketchley Brook32 spills, 34 hours in 2025
1.6 km away
Severn Trent Water
Barwell - The Common Pumping Stninto Trib Of Thurlaston Brook27 spills, 32 hours in 2025
1.8 km away
Severn Trent Water
Sunnyside Cso 1into Tributary Of Tweed River4 spills, 12 hours in 2025
900 m away
Severn Trent Water
Westray Drive Csointo Battling Brook0 spills, 0 hours in 2025
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
application due November 2027 23.8 km away
Decided
M42 Junction 6 ImprovementHighways · Junction 6 of the M42 motorway, close to the National Exhibition Centre (NEC)
Tesco Distribution Depot, Dodwells Road - Solar PanelsApproved, not yet built
Sept 2024 4.1 km away
Rooftop solar
Burbage House - Solar ArrayApproved, not yet built · 300 kW
Jul 2023 4.1 km away
Running nearest: Basin Bridge Farm (solar farm, 4.3 km); The Stables (solar farm, 4.4 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 7.1 km); Judkins Landfill Site Phase 3 (landfill gas, 8.7 km); Hall Farm Solar Farm (Newbold Verdon) (solar farm, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Castlemaine Drive, HinckleyUtility asset works · CADENT GAS LIMITED · Road closure
Apr 2027 to May 2027 450 m away
Major, planned
Portland Drive, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Mar 2027 to Apr 2027 450 m away
Major
Portland Drive, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Mar 2027 to Apr 2027 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.