What's changing near LE10 1TG
Within 2 km, around Hinckley East in Hinckley and Bosworth. Building, planning, schools, transport, prices and crime.
75new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.1%like-for-like prices in Hinckley East, 2024 → 2025 (council +2.8%)
-14%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · Jun 2025 – Feb 2026
Feb 2026
1.1 km away - New homes
35 new homes completedflats · Jul 2025
Jul 2025
1.3 km away - New homes
10 new homes completedhouses · Jun 2025
Jul 2025
2.0 km away - New homes
6 new homes completedflats · Nov 2024
Nov 2024
1.4 km away - School closed
School closed: Compass Community School BarwellOther independent special school, other independent special school (de-registered)
May 2022
1.2 km away - New school
New school: Compass Community School BarwellOther independent special school, other independent special school
Aug 2020
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 23 m²
16since energy certificates began (2008)
2in LE10 1TG itself
- Extendedcertificate 2025
- Extendedcertificate 2021
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
78hours of spills in 2025 between them (typical neighbourhood: about 36)
63spill events counted
- Severn Trent Water
Forest Road Csointo Sketchley Brook32 spills, 34 hours in 2025
1.8 km away - Severn Trent Water
Barwell - The Common Pumping Stninto Trib Of Thurlaston Brook27 spills, 32 hours in 2025
1.7 km away - Severn Trent Water
Sunnyside Cso 1into Tributary Of Tweed River4 spills, 12 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
26 planned, approved or being built and 9 running (30 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Hinckley Leisure Centre, Argents Mead - Solar PanelsApproved, not yet built · 310 kW
Aug 2024
1.7 km away - Rooftop solar
Morrison Supermarkets, Cloverfield - Solar PanelsApproved, not yet built · 440 kW
Nov 2022
1.7 km away - Rooftop solar
Heath Lane Academy, Heath Lane - Solar PanelsApproved, not yet built · 280 kW
Jun 2026
3.0 km away - Rooftop solar
Dpd International Gateway, Logix Road Phase 1 - Solar PanelsApproved, not yet built · 750 kW
Oct 2023
3.4 km away - Solar farm
Kirkby RoadApproved, not yet built · 24 MW
Oct 2022
3.4 km away - Solar farm
E M E B Sports & Social Club, Nutts Lane - Solar ArrayApproved, not yet built · 300 kW
Nov 2023
3.4 km away - Solar farm
Triumph Motorcycles, Normandy Way - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023
3.6 km away - Solar farm
Lychgate Lane, Aston Flamville - Solar FarmBeing built · 20 MW
Jun 2026
3.7 km away - Rooftop solar
DPD International Gateway, Logix Road - Phase 2, Solar PanelsApproved, not yet built · 500 kW
Apr 2024
3.7 km away - Biomass
Manor Farm, Sharnford Road - Biomass BoilerApproved, not yet built · 290 kW
Jan 2023
4.0 km away
Road and street works within 1 km
17 permitted works running now or planned, 16 of them major.
- Major, planned
Coppice Walk, HinckleyUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Jan 2027 to Jan 2027
200 m away - Major, planned
Darwin Close, HinckleyUtility asset works · CADENT GAS LIMITED · Road closure
May 2027 to May 2027
250 m away - Major
Darwin Close, HinckleyUtility asset works · CADENT GAS LIMITED · Road closure
May 2027 to May 2027
250 m away - Major, planned
Ribblesdale Avenue, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Mar 2027 to Mar 2027
250 m away - Major
Ribblesdale Avenue, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Mar 2027 to Mar 2027
250 m away - Major, planned
Portland Drive, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Mar 2027 to Apr 2027
300 m away - Major
Portland Drive, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Mar 2027 to Apr 2027
300 m away - Major, planned
Castlemaine Drive, HinckleyUtility asset works · CADENT GAS LIMITED · Road closure
Apr 2027 to May 2027
300 m away - Major, planned
Warwick Gardens, HinckleyUtility asset works · CADENT GAS LIMITED · Road closure
Apr 2027 to Apr 2027
300 m away - Major
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
2.6 km away - Decideddecided Feb 2026
16.5 km away - Decideddecided Jul 2014
23.8 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
24.0 km away - Decideddecided May 2020
26.8 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The Stables (solar farm, 4.2 km); Basin Bridge Farm (solar farm, 4.2 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 7.0 km); Hall Farm Solar Farm (Newbold Verdon) (solar farm, 8.5 km); Judkins Landfill Site Phase 3 (landfill gas, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.