What's changing near LE10 1JF
Within 2 km, around Hinckley East in Hinckley and Bosworth. Building, planning, schools, transport, prices and crime.
98new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.1%like-for-like prices in Hinckley East, 2024 → 2025 (council +2.8%)
-14%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
11 new homes completedhouses · Jun 2025 – Oct 2026
Oct 2026
600 m away - New homes
5 new homes completedhouses · Aug 2025 – Aug 2026
Aug 2026
1.8 km away - New homes
35 new homes completedflats · Jul 2025
Jul 2025
1.1 km away - New homes
10 new homes completedhouses · Jun 2025
Jul 2025
950 m away - New homes
15 new homes completed4 flats, 11 houses · Jun 2025
Jun 2025
1000 m away - New homes
6 new homes completedflats · Nov 2024
Nov 2024
800 m away - New schoolAug 2020
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 22 m²
21since energy certificates began (2008)
4in LE10 1JF itself
- Extendedcertificate 2025
- Extendedcertificate 2025
- Extendedcertificate 2023
- Extendedcertificate 2017
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
10storm overflows within 2 km
186hours of spills in 2025 between them (typical neighbourhood: about 36)
118spill events counted
- Severn Trent Water
Sapcote-Aston Firs Pumping Stationinto Tributary Of Thurlaston Brook6 spills, 41 hours in 2025
1.6 km away - Severn Trent Water
Burbage - Sapcote Road Csointo Tributary Of Soar Brook27 spills, 38 hours in 2025
1.5 km away - Severn Trent Water
Forest Road Csointo Sketchley Brook32 spills, 34 hours in 2025
750 m away - Severn Trent Water
Hinckley - Hawley Rd/Station Rd (Cso)into Sketchley Brook18 spills, 31 hours in 2025
1.7 km away - Severn Trent Water
Brookside Hinckley Csointo Sketchley Brook27 spills, 28 hours in 2025
1.3 km away - Severn Trent Water
Sunnyside Cso 1into Tributary Of Tweed River4 spills, 12 hours in 2025
1.4 km away - Severn Trent Water
Banky Meadow Csointo Tributary Of Soar Brook3 spills, 2 hours in 2025
1.4 km away - Severn Trent Water
Burbage - Woodland Ave (Cso)into Unnamed Tributary Of Soar Brook0 spills, 0 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
25 planned, approved or being built and 8 running (28 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Hinckley Leisure Centre, Argents Mead - Solar PanelsApproved, not yet built · 310 kW
Aug 2024
950 m away - Rooftop solar
Morrison Supermarkets, Cloverfield - Solar PanelsApproved, not yet built · 440 kW
Nov 2022
2.1 km away - Rooftop solar
Dpd International Gateway, Logix Road Phase 1 - Solar PanelsApproved, not yet built · 750 kW
Oct 2023
2.5 km away - Solar farm
E M E B Sports & Social Club, Nutts Lane - Solar ArrayApproved, not yet built · 300 kW
Nov 2023
2.8 km away - Solar farm
Lychgate Lane, Aston Flamville - Solar FarmBeing built · 20 MW
Jun 2026
2.9 km away - Rooftop solar
DPD International Gateway, Logix Road - Phase 2, Solar PanelsApproved, not yet built · 500 kW
Apr 2024
2.9 km away - Rooftop solar
Burbage House - Solar ArrayApproved, not yet built · 300 kW
Jul 2023
3.3 km away - Biomass
Manor Farm, Sharnford Road - Biomass BoilerApproved, not yet built · 290 kW
Jan 2023
3.4 km away - Solar farm
Triumph Motorcycles, Normandy Way - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023
3.4 km away - Solar farm
Elms Farm - Hinckley Solar Farm & Battery StorageApproved, not yet built · 50 MW
Nov 2022
3.5 km away
Road and street works within 1 km
10 permitted works running now or planned, 8 of them major.
- Major, planned
Footpath U58, BurbageHighway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
800 m away - Major
Footpath U58, BurbageHighway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
800 m away - Major, planned
Saville Close, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Feb 2027 to Mar 2027
850 m away - Major
Saville Close, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Feb 2027 to Mar 2027
850 m away - Major, planned
Stoneygate Drive, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Jan 2027 to Feb 2027
950 m away - Major
Stoneygate Drive, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Jan 2027 to Feb 2027
950 m away - Major, planned
Ribblesdale Avenue, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Mar 2027 to Mar 2027
1000 m away - Major
Ribblesdale Avenue, HinckleyUtility asset works · CADENT GAS LIMITED · Multi-way signals
Mar 2027 to Mar 2027
1000 m away - Standard
Castle Street, HinckleyUtility repair and maintenance works · National Grid Electricity Distribution (East Midlands) · No carriageway incursion
Oct 2026 to Oct 2026
750 m away
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
2.6 km away - Decideddecided Feb 2026
15.5 km away - Decideddecided Jul 2014
22.9 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
23.1 km away - Decideddecided May 2020
26.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Basin Bridge Farm (solar farm, 4.6 km); The Stables (solar farm, 5.0 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 7.1 km); Judkins Landfill Site Phase 3 (landfill gas, 8.5 km); Judkins Landfill Scheme (landfill gas, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.