Country England and Wales › Region East Midlands › Council Hinckley and Bosworth › Neighbourhood Hinckley West › Postcode LE10 0UR What's changing near LE10 0UR Within 2 km, around Hinckley West in Hinckley and Bosworth. Building, planning, schools, transport, prices and crime.
197 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+3.4% like-for-like prices in Hinckley West, 2024 → 2025 (council +2.8%)
-11% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 19 new homes completed houses · Aug 2025 – Oct 2026
Oct 2026 750 m away New homes 9 new homes completed houses · Jul 2025 – Sep 2026
Sept 2026 1.2 km away New homes 29 new homes completed houses · Oct 2025 – Aug 2026
Aug 2026 1.3 km away New homes 16 new homes completed houses · Apr 2026 – Jul 2026
Jul 2026 800 m away New homes 10 new homes completed houses · Jun 2025 – Feb 2026
Feb 2026 1.9 km away New homes 17 new homes completed houses · May 2025 – Jan 2026
Jan 2026 1000 m away New homes 17 new homes completed houses · May 2025 – Nov 2025
Nov 2025 1.0 km away New homes 5 new homes completed houses · Sep 2025
Oct 2025 1.2 km away New homes 35 new homes completed flats · Jul 2025
Jul 2025 1.5 km away New homes 6 new homes completed houses · May 2025
May 2025 800 m away New homes 5 new homes completed houses · Feb 2025
Mar 2025 1.0 km away New homes 7 new homes completed houses · Nov 2024 – Feb 2025
Feb 2025 1.1 km away 13 homes extended 2021–2025, typically adding 27 m²
22 since energy certificates began (2008)
0 in LE10 0UR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 11 storm overflows within 2 km
508 hours of spills in 2025 between them (typical neighbourhood: about 36)
137 spill events counted
Severn Trent Water Hinckley Sewage Treatment Works into Sketchley Brook 42 spills, 318 hours in 2025
1.3 km away Severn Trent Water Brodick Road Cso into Harrow Brook 14 spills, 38 hours in 2025
550 m away Severn Trent Water Hinckley Sewage Treatment Works into Sketchley Brook 15 spills, 34 hours in 2025
1.3 km away Severn Trent Water Hinckley - Hawley Rd/Station Rd (Cso) into Sketchley Brook 18 spills, 31 hours in 2025
1.4 km away Severn Trent Water Southfield Road Storm Overflow into Sketchley Brook 9 spills, 30 hours in 2025
1.4 km away Severn Trent Water Brookside Hinckley Cso into Sketchley Brook 27 spills, 28 hours in 2025
1.8 km away Severn Trent Water Coventry Road - Nutts Lane Cso into The Battling Brook 9 spills, 14 hours in 2025
550 m away Severn Trent Water Hinckley - Harrowbrook Road Cso into Harrow Brook 2 spills, 13 hours in 2025
1.4 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 6 running (21 MW between them). Those within 5 km are on the map above.
Solar farm E M E B Sports & Social Club, Nutts Lane - Solar Array Approved, not yet built · 300 kW
Nov 2023 750 m away Solar farm Triumph Motorcycles, Normandy Way - Solar PV Array Approved, not yet built · 1 MW
Nov 2023 1.0 km away Rooftop solar Tesco Distribution Depot, Dodwells Road - Solar Panels Approved, not yet built
Sept 2024 1.3 km away Rooftop solar Dpd International Gateway, Logix Road Phase 1 - Solar Panels Approved, not yet built · 750 kW
Oct 2023 1.4 km away Rooftop solar Morrison Supermarkets, Cloverfield - Solar Panels Approved, not yet built · 440 kW
Nov 2022 1.6 km away Rooftop solar Hinckley Leisure Centre, Argents Mead - Solar Panels Approved, not yet built · 310 kW
Aug 2024 1.6 km away Rooftop solar DPD International Gateway, Logix Road - Phase 2, Solar Panels Approved, not yet built · 500 kW
Apr 2024 1.6 km away Solar farm Elms Farm - Hinckley Solar Farm & Battery Storage Approved, not yet built · 50 MW
Nov 2022 1.8 km away Battery storage Elms Farm - Solar Farm & Battery Storage Approved, not yet built
Nov 2022 1.8 km away Battery storage Hydes Lane, Stretton Baskerville - Battery Storage Approved, not yet built
Jul 2024 2.0 km away Road and street works within 1 km 3 permitted works running now or planned, 2 of them major.
Major, planned Ashford Road, Hinckley Disconnection or alteration of supply · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026 700 m away Major Ashford Road, Hinckley New service connection · CADENT GAS LIMITED · Road closure
Oct 2026 to Oct 2026 700 m away Minor Oban Road, Hinckley Highway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Mar 2025 5.1 km away Decided decided Feb 2026 14.5 km away Decided decided May 2020 24.0 km away Decided decided Jul 2014 24.1 km away Pre-application Daventry International Rail Freight Terminal Phase 4 (DIRFT 4) Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027 24.4 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Basin Bridge Farm (solar farm, 2.8 km); The Stables (solar farm, 4.0 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 4.9 km); Judkins Landfill Site Phase 3 (landfill gas, 6.1 km); Judkins Landfill Scheme (landfill gas, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.