Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
504hours of spills in 2025 between them (typical neighbourhood: about 36)
291spill events counted
United Utilities
Ferry Pumping Station Site Id 04528into Walney Channel · near bathing water: Walney Biggar Bank; Walney West Shore; Walney Sandy Gap58 spills, 338 hours in 2025
300 m away
United Utilities
Graving Dock Pumping Stationinto Walney Channel · near bathing water: Walney Biggar Bank; Walney West Shore; Walney Sandy Gap96 spills, 96 hours in 2025
550 m away
United Utilities
Ainslie Street/Newport St Cso 041a7into Ormsgill Reservoir34 spills, 34 hours in 2025
1.8 km away
United Utilities
Harbour Yard Pumping Stationinto Walney Channel · near bathing water: Walney Biggar Bank; Walney West Shore; Walney Sandy Gap65 spills, 31 hours in 2025
1.1 km away
United Utilities
Ainslie St/Harrogate Stinto Ormsgill Reservoir · near bathing water: Walney West Shore30 spills, 6 hours in 2025
1.8 km away
United Utilities
Oxford Street/Ainslie Street Csointo Ormsgill Reservoir · near bathing water: Walney West Shore7 spills, 1 hours in 2025
1.8 km away
United Utilities
Romney Road/Titchfield Street Csointo Ormsgill Reservoir · near bathing water: Walney West Shore1 spills, 0 hours in 2025
1.8 km away
United Utilities
Ainslie St Oxford St Cso 041a9into Ormsgill Reservoir · near bathing water: Walney West Shore0 spills, 0 hours in 2025
1.8 km away
Solar, wind and battery projects within 10 km
12 planned, approved or being built and 5 running (67 MW between them). Those within 5 km are on the map above.
Rooftop solar
North Road - Roof Mounted Solar ArraysApproved, not yet built
Jan 2022 300 m away
Rooftop solar
Wm Morrison Supermarkets, The Strand - PV equipmentApproved, not yet built · 580 kW
May 2024 950 m away
Solar farm
Cavendish Dock Road - Solar ArrayPlanning application in · 40 MW
Mar 2025 1.1 km away
Solar farm
Dova Way, Barrow Island - Solar ArrayApproved, not yet built · 2 MW
Mar 2023 1.3 km away
Rooftop solar
Barrow Leisure Centre, Greengate Street - Solar PanelsApproved, not yet built · 430 kW
Aug 2025 1.9 km away
Hydrogen
Barrow in Furness - Barrow Green Hydrogen HubApproved, not yet built · 35 MW
Jun 2023 2.9 km away
Battery storage
Roosecote Power Station, Rampside Road - Battery Energy Storage SystemPlanning application in · 50 MW
Aug 2025 3.2 km away
Solar farm
Sandscale Park - Solar ArrayApproved, not yet built · 2 MW
Mar 2023 4.4 km away
Rooftop solar
JJC Waste Management, Sandscale Park - Solar PanelsApproved, not yet built · 730 kW
Jul 2023 4.8 km away
Solar farm
Bleabeck - Solar FarmPlanning application in · 10 MW
Feb 2025 7.0 km away
Wind farm
Road and street works within 1 km
5 permitted works running now or planned, 3 of them major.
Major, planned
Island Road, Barrow-In-FurnessUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026 750 m away
Major
Island Road, Barrow-In-FurnessUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Nov 2026 to Nov 2026 750 m away
Major
Central Drive, Barrow-In-FurnessUtility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Oct 2026 800 m away
Standard
Margate Street, Barrow-In-FurnessWorks for road purposes · Westmorland and Furness Council · Some carriageway incursion
Nov 2026 to Nov 2026 850 m away
Standard
Forshaw Street, Barrow-In-FurnessDisconnection or alteration of supply · SP Electricity North West · Some carriageway incursion
Nov 2026 to Nov 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Walney Island South & Barrow Island: +35% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.7% in two years.