What's changing near L9 6EG
Within 2 km, around Fazakerley North in Liverpool. Building, planning, schools, transport, prices and crime.
51new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+8.3%like-for-like prices in Fazakerley North, 2024 → 2025 (council +6.3%)
+3%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedflats · Sep 2025 – Nov 2025
Nov 2025
1.9 km away - New homes
25 new homes completed8 flats, 17 houses · Dec 2024 – Jul 2025
Jul 2025
750 m away - New homes
16 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025
800 m away - New schoolFeb 2024
1.9 km away - New schoolSept 2021
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 19 m²
20since energy certificates began (2008)
0in L9 6EG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
173hours of spills in 2025 between them (typical neighbourhood: about 36)
22spill events counted
- United Utilities
Fazakerley Wwtwinto River Alt18 spills, 168 hours in 2025
1.1 km away - United Utilities
Croxteth Hall Lane Cso 261qdinto River Alt4 spills, 5 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
66 planned, approved or being built and 7 running (136 MW between them). Those within 5 km are on the map above.
- Battery storage
Jeffrey Humble Playing Fields, Long Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025
650 m away - Rooftop solar
Dixons Croxteth Academy, Carr Lane East - Solar PanelsApproved, not yet built · 170 kW
Oct 2025
1.3 km away - Rooftop solar
D H L Exel Supply Chain Burton Foods, Portal Way - Solar PanelsPlanning application in · 1 MW
Jun 2023
2.2 km away - Rooftop solar
SCS Lighting & Renewables, Aintree - Solar PanelsPlanning application in · 340 kW
Jun 2022
3.2 km away - Battery storage
Heysham Box, Leckwith Road - Battery StorageApproved, not yet built · 200 kW
Nov 2022
3.9 km away - Battery storage
Heysham Box, Leckwith Road - Battery StorageApproved, not yet built · 200 kW
Mar 2025
3.9 km away - Rooftop solar
Peter Gilding And Company, Caddick Road - Solar PanelsApproved, not yet built · 470 kW
Dec 2024
4.1 km away - Rooftop solar
Beverston Engineering, Unit B - Solar PanelsApproved, not yet built · 200 kW
Sept 2025
4.1 km away - Rooftop solar
Penrhyn Court, Penrhyn Road - Solar PanelsApproved, not yet built · 260 kW
Feb 2026
4.1 km away - Rooftop solar
Adlib House, Kitling Road - Solar PanelsApproved, not yet built · 240 kW
Sept 20234.2 km away
Road and street works within 1 km
29 permitted works running now or planned, 5 of them major.
- Major
East Lancashire Road, LiverpoolUtility repair and maintenance works · MANWEB · Lane closure
Sept 2026 to Nov 2026
300 m away - Major
Lower Lane, LiverpoolUtility repair and maintenance works · MANWEB · Two-way signals
Sept 2026 to Oct 2026
650 m away - Major, planned
Brookfield Drive, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Sept 2026 to Oct 2026
800 m away - Major, planned
Brookfield Drive, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Sept 2026 to Oct 2026
800 m away - Major
Brookfield Drive, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Sept 2026 to Oct 2026
800 m away - Standard
Ranworth Way, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
300 m away - Standard
Haselbeech Crescent, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Standard
Haselbeech Close, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Standard
Shottesbrook Green, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
7.6 km away - Decideddecided May 2015
12.3 km away - Decideddecided Sept 2014
18.2 km away - Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025
21.0 km away - Pre-applicationapplication due April 2027
21.3 km away - Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Land at Carnegie Road (battery storage, 3.8 km); Lister Drive (battery storage, 3.8 km); Liverpool Energy Management Facility (battery storage, 3.8 km); Port of Liverpool - wind (wind farm, 5.4 km); IBL Cold Stores - Solar Photovoltaics Panels (rooftop solar, 6.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.