Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
3spill events counted
United Utilities
Park Street Combined Sewer Overflowinto River Mersey Estuary3 spills, 0 hours in 2025
Dexter Street, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Nov 2026 to Nov 2026 850 m away
Major
Dexter Street, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Nov 2026 to Nov 2026 850 m away
Major, planned
Windsor View, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 850 m away
Major
Parliament Street, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Sept 2026 to Oct 2026 900 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
New-home postcodes with fewer than 5 homes are counted above but not listed. 30 postcodes nearby had new homes completed in the last two years.
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 3.5 km away
Rooftop solar
The Big Yellow Self Storage, Mill Lane - Solar ArrayApproved, not yet built · 170 kW
May 2023 3.6 km away
Running nearest: Land at Carnegie Road (battery storage, 3.4 km); Lister Drive (battery storage, 3.4 km); Liverpool Energy Management Facility (battery storage, 3.4 km); Bromborough Dock Landfill Scheme (landfill gas, 4.7 km); Bromborough Dock (landfill gas, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Pomfret Street, LiverpoolUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jan 2027 to Jan 2027 500 m away
Standard
Thackeray Close, LiverpoolUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jan 2027 to Feb 2027 550 m away
Standard
Arundel Close, LiverpoolUtility asset works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Nov 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 21.1 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 25.6 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 26.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.