Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Chatsworth Drive, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away
Major
Chatsworth Drive, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 300 m away
Major, planned
Hall Lane, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
Major
Hall Lane, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
Major, planned
Saxony Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 750 m away
Major
Saxony Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 750 m away
Major, planned
Botanic Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 750 m away
Major
Botanic Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026750 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
School closed: The Studio @ DeyesStudio schools, secondary (closure)
Aug 2020 1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 29 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021 3.1 km away
Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025 3.9 km away
Running nearest: Land at Carnegie Road (battery storage, 2.6 km); Lister Drive (battery storage, 2.6 km); Liverpool Energy Management Facility (battery storage, 2.6 km); Bromborough Dock Landfill Scheme (landfill gas, 5.5 km); Port of Liverpool - wind (wind farm, 6.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major, planned
Renfrew Street, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
Major
Renfrew Street, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away
Major, planned
Windsor View, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 21.9 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 24.9 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 26.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.