Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
66 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
Rooftop solar
Sainsburys, Jennifer Avenue - Solar panelsApproved, not yet built · 450 kW
Aug 2023 250 m away
Rooftop solar
North Liverpool Academy, Heyworth Street - Solar PV ArrayPlanning application in · 210 kW
Jul 2025 500 m away
Rooftop solar
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022 1.6 km away
Rooftop solar
Steel Terminal, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 2.0 km away
Rooftop solar
Bulk Powder Terminals, Regent Road - Solar PanelsApproved, not yet built · 700 kW
Feb 2024 2.2 km away
Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024 2.3 km away
Rooftop solar
Waste Care, Lower Bank View - Solar PanelsApproved, not yet built · 210 kW
Feb 2025 2.3 km away
Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026 2.4 km away
Rooftop solar
Temp Control Building - Solar PanelsApproved, not yet built
Mar 2024 3.0 km away
Rooftop solar
Multiuser 5 Building, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 3.2 km away
Road and street works within 1 km
8 permitted works running now or planned, 2 of them major.
Major, planned
Gardners Row, LiverpoolDisconnection or alteration of supply · MANWEB · No carriageway incursion
Sept 2026 to Jan 2027 1000 m away
Major
Gardners Row, LiverpoolDisconnection or alteration of supply · MANWEB · No carriageway incursion
Sept 2026 to Jan 2027 1000 m away
Standard
Beacon Lane, LiverpoolUtility repair and maintenance works · MANWEB · Give and take
Oct 2026 to Nov 2026 450 m away
Standard
Stanley Road, LiverpoolUtility repair and maintenance works · MANWEB · Multi-way signals
Oct 2026 to Oct 2026 1000 m away
Standard
Lambeth Road, LiverpoolUtility repair and maintenance works · MANWEB · Multi-way signals
Oct 2026 to Oct 2026 1000 m away
Minor
Scotland Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Lane closure
Oct 2026 to Oct 2026 450 m away
Minor
Scotland Road, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away
Minor
Stanley Road, LiverpoolUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
School closed: Rotunda Independent School for ExcellentOther independent school, other independent school (closure)
Jan 2021 700 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 18 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Stanley Meat Market, Prescot Road - Solar PV SystemsApproved, not yet built · 300 kW
Jul 2024 3.4 km away
Rooftop solar
Multiuser 4 Building - Solar PanelsApproved, not yet built
Feb 2024 3.5 km away
Running nearest: Land at Carnegie Road (battery storage, 3.2 km); Lister Drive (battery storage, 3.2 km); Liverpool Energy Management Facility (battery storage, 3.2 km); Port of Liverpool - wind (wind farm, 3.5 km); Burbo Bank Energy Storage (battery storage, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 23.2 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 25.9 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 28.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.