Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
69 planned, approved or being built and 8 running (138 MW between them). Those within 5 km are on the map above.
Battery storage
Jeffrey Humble Playing Fields, Long Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025 1.9 km away
Battery storage
Hawthorne RoadBeing built · 20 MW
Mar 2022 2.4 km away
Rooftop solar
North Liverpool Academy, Heyworth Street - Solar PV ArrayPlanning application in · 210 kW
Jul 2025 2.5 km away
Rooftop solar
Waste Care, Lower Bank View - Solar PanelsApproved, not yet built · 210 kW
Feb 2025 2.7 km away
Rooftop solar
Multiuser 5 Building, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 2.9 km away
Rooftop solar
Steel Terminal, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 2.9 km away
Rooftop solar
Sainsburys, Jennifer Avenue - Solar panelsApproved, not yet built · 450 kW
Aug 2023 2.9 km away
Rooftop solar
Multiuser 4 Building - Solar PanelsApproved, not yet built
Feb 2024 3.1 km away
Rooftop solar
Multiuser 1 Building, Regent Road - Solar PanelsApproved, not yet built
Feb 2024 3.1 km away
Rooftop solar
Royal Seaforth Dock, New Jenkins Sheds - Solar PanelsApproved, not yet built · 310 kW
Feb 2024 3.1 km away
Road and street works within 1 km
69 permitted works running now or planned, 58 of them major.
Major, planned
Barbrook Way, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 550 m away
Major
Honeysuckle Drive, LiverpoolNew service connection · MANWEB · Give and take
Oct 2026 to Jan 2027 700 m away
Major, planned
Lobelia Avenue, LiverpoolUtility repair and maintenance works · MANWEB · Give and take
Nov 2026 to Feb 2027 700 m away
Major
Lobelia Avenue, LiverpoolUtility repair and maintenance works · MANWEB · Give and take
Nov 2026 to Feb 2027 700 m away
Major, planned
Lobelia Avenue, LiverpoolUtility repair and maintenance works · MANWEB · Give and take
Dec 2026 to Mar 2027 700 m away
Major
Lobelia Avenue, LiverpoolUtility repair and maintenance works · MANWEB · Give and take
Dec 2026 to Mar 2027 700 m away
Major
Pampas Grove, LiverpoolDisconnection or alteration of supply · MANWEB · Give and take
Sept 2026 to Dec 2026 750 m away
Major
Lavender Way, LiverpoolUtility repair and maintenance works · MANWEB · Give and take
Aug 2026 to Dec 2026 750 m away
Major, planned
Chestnut Road, LiverpoolUtility repair and maintenance works · MANWEB · Give and take
Dec 2026 to Mar 2027 750 m away
Major
Chestnut Road, Liverpool
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 21.8 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Walton Hall: +51% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.3% in two years.
Bulk Powder Terminals, Regent Road - Solar PanelsApproved, not yet built · 700 kW
Feb 2024 3.1 km away
Rooftop solar
Multiuser 2 Building, Regent Road - Solar PanelsApproved, not yet built
Feb 2024 3.3 km away
Running nearest: Port of Liverpool - wind (wind farm, 3.1 km); Land at Carnegie Road (battery storage, 3.5 km); Lister Drive (battery storage, 3.5 km); Liverpool Energy Management Facility (battery storage, 3.5 km); Royal Seaforth Dock Wind Farm (wind farm, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Utility repair and maintenance works · MANWEB · Give and take
Dec 2026 to Mar 2027 750 m away
Major, planned
Chestnut Road, LiverpoolUtility repair and maintenance works · MANWEB · Some carriageway incursion
Nov 2026 to Feb 2027 750 m away
Major
Chestnut Road, LiverpoolUtility repair and maintenance works · MANWEB · Some carriageway incursion
Nov 2026 to Feb 2027 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 26.1 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 28.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.