Country England and Wales › Region North West › Council West Lancashire › Neighbourhood Burscough › Postcode L40 7TD What's changing near L40 7TD Within 2 km, around Burscough in West Lancashire. Building, planning, schools, transport, prices and crime.
238 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+7.1% like-for-like prices in Burscough, 2024 → 2025 (council +3.4%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 40 new homes completed houses · Dec 2024 – Sep 2026
Sept 2026 600 m away New homes 17 new homes completed houses · Dec 2025 – Sep 2026
Sept 2026 800 m away New homes 29 new homes completed houses · Sep 2025 – Sep 2026
Sept 2026 750 m away New homes 21 new homes completed houses · May 2025 – Jun 2026
Jun 2026 600 m away New homes 12 new homes completed houses · Mar 2025 – Mar 2026
Mar 2026 600 m away New homes 15 new homes completed houses · Oct 2025 – Jan 2026
Jan 2026 750 m away New homes 17 new homes completed houses · Nov 2024 – Dec 2025
Dec 2025 650 m away New homes 5 new homes completed houses · Oct 2024 – Dec 2025
Dec 2025 650 m away New homes 46 new homes completed 2 flats, 44 houses · Nov 2024 – Oct 2025
Oct 2025 650 m away New homes 6 new homes completed houses · Jul 2025 – Oct 2025
Oct 2025 550 m away New homes 6 new homes completed houses · Jul 2025
Jul 2025 650 m away New homes 10 new homes completed houses · Nov 2024 – Apr 2025
Apr 2025 450 m away 16 homes extended 2021–2025, typically adding 22 m²
31 since energy certificates began (2008)
0 in L40 7TD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 5 running (12 MW between them). Those within 5 km are on the map above.
Wind farm Deans Lane Wind Turbine Approved, not yet built
Nov 2021 3.2 km away Battery storage Avondale Nurseries, Spa Lane - Battery Energy Storage Approved, not yet built · 320 MW
Jul 2025 3.9 km away Rooftop solar Ormskirk General Hospital, Wigan Road - Solar Panels Approved, not yet built
May 2026 4.1 km away Battery storage Unit 5 XL Business Park Being built · 50 MW
Jul 2021 4.7 km away Rooftop solar West Lancashire College, College Way -Solar Panels Approved, not yet built · 220 kW
Oct 2024 6.6 km away Rooftop solar Hannah Food Services, Garnett Place - Solar Photovoltaic Panels Approved, not yet built · 360 kW
Mar 2024 7.4 km away Rooftop solar Huntapac Produce Limited, Blackgate Lane - Solar Photovoltaic System Approved, not yet built · 1 MW
Feb 2023 7.5 km away Rooftop solar St Francis Of Assisi Catholic Primary School - Solar Panels Approved, not yet built · 160 kW
Nov 2025 8.4 km away Biomass Liverpool Road, Bickerstaffe - Biomass boiler Approved, not yet built · 500 kW
Apr 2021 8.7 km away Rooftop solar Wrightington Hospital, Hall Lane - Solar Panels Approved, not yet built · 150 kW
Jan 2026 8.9 km away Road and street works within 1 km 2 permitted works running now or planned.
Standard Furnival Drive, Burscough New service connection · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Nov 2026 300 m away Minor Liverpool Road North, Burscough Disconnection or alteration of supply · United Utilities Water Ltd · Two-way signals
Oct 2026 to Oct 2026 350 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2015 7.2 km away Decided decided Sept 2026 23.4 km away Pre-application Intermodal Logistics Park North Rail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north). application due May 2027 23.7 km away Pre-application Mersey Tidal Power Project Generating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028 23.9 km away Decided decided Sept 2014 26.6 km away Decided decided Apr 2020 28.7 km away Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lathom (Pilkington Technical Centre) (solar farm, 3.5 km); Lathom (Pilkington Technical Centre) Battery Storage (battery storage, 3.5 km); Sanko Gosei Solar Panels (rooftop solar, 5.3 km); Mawdesley Moss (wind farm, 5.8 km); West Quarry (landfill gas, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.