Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
2,411hours of spills in 2025 between them (typical neighbourhood: about 36)
371spill events counted
United Utilities
Birkenhead Wwtw Birkeinto Mersey Estuary · near bathing water: Moreton; Wallasey105 spills, 1,273 hours in 2025
1.9 km away
United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton164 spills, 769 hours in 2025
1.6 km away
United Utilities
Birkenhead Wwtw Birkeinto River Birket (Great Culvert - Downstream Length) · near bathing water: Moreton; Wallasey41 spills, 226 hours in 2025
1.9 km away
United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton48 spills, 139 hours in 2025
1.6 km away
United Utilities
St Nicholas Storm Sewer Overflowinto Mersey Estuary · near bathing water: Wallasey7 spills, 3 hours in 2025
700 m away
United Utilities
Gower St/Kings Dock Csointo Mersey Estuary4 spills, 1 hours in 2025
1.2 km away
United Utilities
Battery Lane Csointo The Mersey Estuary · near bathing water: Wallasey2 spills, 0 hours in 2025
1.6 km away
United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton0 spills, 0 hours in 2025
Gardners Row, LiverpoolDisconnection or alteration of supply · MANWEB · No carriageway incursion
Sept 2026 to Jan 2027 700 m away
Major
Gardners Row, LiverpoolDisconnection or alteration of supply · MANWEB · No carriageway incursion
Sept 2026 to Jan 2027 700 m away
Major
Vauxhall Road, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Dec 2026 to Mar 2028 800 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
New-home postcodes with fewer than 5 homes are counted above but not listed. 24 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Waste Care, Lower Bank View - Solar PanelsApproved, not yet built · 210 kW
Feb 2025 3.2 km away
Rooftop solar
Tesco SuperstoreApproved, not yet built
Apr 2021 3.3 km away
Running nearest: Burbo Bank Energy Storage (battery storage, 4.3 km); Land at Carnegie Road (battery storage, 4.3 km); Lister Drive (battery storage, 4.3 km); Liverpool Energy Management Facility (battery storage, 4.3 km); Port of Liverpool - wind (wind farm, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major
Islington, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Nov 2026 to Nov 2026 950 m away
Standard
Hunter Street, LiverpoolUtility repair and maintenance works · MANWEB · Lane closure
Oct 2026 to Oct 2026 800 m away
Minor
Victoria Street, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 21.6 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 27.1 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 28.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.