Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
United Utilities
Huyton Farm Pumping Stationinto Un-Named Trib. Of River Alt0 spills, 0 hours in 2025
64 planned, approved or being built and 4 running (121 MW between them). Those within 5 km are on the map above.
Rooftop solar
Earlsfield Park, Arley Drive - Solar PanelsPlanning application in · 150 kW
Jan 2025 2.0 km away
Rooftop solar
Sainsburys Supermarket, East Prescot Road - Solar PanelsApproved, not yet built · 460 kW
Jun 2025 3.0 km away
Rooftop solar
Alder Hey Hospital, East Prescot Road - Solar PV ArrayApproved, not yet built · 470 kW
Mar 2026 3.0 km away
Rooftop solar
Peter Gilding And Company, Caddick Road - Solar PanelsApproved, not yet built · 470 kW
Dec 2024 4.2 km away
Rooftop solar
The Big Yellow Self Storage, Mill Lane - Solar ArrayApproved, not yet built · 170 kW
May 2023 4.2 km away
Rooftop solar
Adlib House, Kitling Road - Solar PanelsApproved, not yet built · 240 kW
Sept 2023 4.4 km away
Battery storage
Lister Battery Limited - Battery Energy Storage SystemApproved, not yet built · 6 MW
Apr 2025 4.5 km away
Rooftop solar
Whiston Hospital, Warrington Road - Solar PanelsApproved, not yet built · 220 kW
Dec 2025 4.5 km away
Rooftop solar
Dixons Croxteth Academy, Carr Lane East - Solar PanelsApproved, not yet built · 170 kW
Oct 2025 4.6 km away
Rooftop solar
Beverston Engineering, Unit B - Solar PanelsApproved, not yet built · 200 kW
Sept 20254.8 km away
Road and street works within 1 km
24 permitted works running now or planned, 3 of them major.
Major
Stockbridge Lane, HuytonHighway repair and maintenance works · KNOWSLEY METROPOLITAN BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026 450 m away
Major
Princess Drive, HuytonHighway repair and maintenance works · KNOWSLEY METROPOLITAN BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026 500 m away
Major
Liverpool Road, HuytonHighway repair and maintenance works · KNOWSLEY METROPOLITAN BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026 600 m away
Standard
Cotsford Road, RobyUtility asset works · United Utilities Water Ltd · Give and take
Oct 2026 to Nov 2026 200 m away
Standard
Mardale Road, HuytonUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 300 m away
Standard
Fairclough Road, HuytonUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
Standard
Mardale Road, HuytonUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
Standard
Pencombe Road, HuytonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 400 m away
Standard
Huyton House Road, HuytonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026400 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 17.9 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Page Moss & Fincham: +51% over five years (2020 → 2025).
Council tax list: 70 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.3% in two years.
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 27.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.