Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
1,657hours of spills in 2025 between them (typical neighbourhood: about 36)
237spill events counted
United Utilities
Birkenhead Wwtw Birkeinto Mersey Estuary · near bathing water: Moreton; Wallasey105 spills, 1,273 hours in 2025
2.0 km away
United Utilities
Birkenhead Wwtw Birkeinto River Birket (Great Culvert - Downstream Length) · near bathing water: Moreton; Wallasey41 spills, 226 hours in 2025
1.9 km away
United Utilities
Dingle Combined Sewer Overflowinto River Mersey Estuary39 spills, 68 hours in 2025
1.9 km away
United Utilities
Woodside Csointo River Mersey Estuary (Tidal) · near bathing water: Wallasey14 spills, 60 hours in 2025
1.8 km away
United Utilities
St Pauls Road Cso 332tx Pre0006into Mersey Estuary · near bathing water: Wallasey31 spills, 29 hours in 2025
1.5 km away
United Utilities
Gower St/Kings Dock Csointo Mersey Estuary4 spills, 1 hours in 2025
1.5 km away
United Utilities
Park Street Combined Sewer Overflowinto River Mersey Estuary3 spills, 0 hours in 2025
400 m away
United Utilities
Birkenhead Wwtw Birkeinto River Birket (Great Culvert -Downstream Length) / Mersey Estuary · near bathing water: Moreton; Wallasey0 spills, 0 hours in 2025
57 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 300 m away
Wind farm
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 300 m away
Rooftop solar
Tesco SuperstoreApproved, not yet built
Apr 2021 1.5 km away
Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026 1.9 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 2.4 km away
Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021 2.7 km away
Rooftop solar
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022 2.9 km away
Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025 3.8 km away
Rooftop solar
Sainsburys, Jennifer Avenue - Solar panelsApproved, not yet built · 450 kW
Aug 2023 3.9 km away
Rooftop solar
North Liverpool Academy, Heyworth Street - Solar PV ArrayPlanning application in · 210 kW
Jul 2025 4.2 km away
Rooftop solar
Road and street works within 1 km
7 permitted works running now or planned, 7 of them major.
Major, planned
Pleasant Hill Street, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 500 m away
Major, planned
Sefton Street, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 500 m away
Major
Sefton Street, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 500 m away
Major, planned
Caryl Street, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 650 m away
Major
Parliament Street, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Sept 2026 to Oct 2026 950 m away
Major, planned
Dexter Street, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Nov 2026 to Nov 2026 1000 m away
Major
Dexter Street, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Nov 2026 to Nov 2026 1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 27.3 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 27.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.