Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
13storm overflows within 2 km
3,413hours of spills in 2025 between them (typical neighbourhood: about 36)
562spill events counted
United Utilities
Birkenhead Wwtw Birkeinto Mersey Estuary · near bathing water: Moreton; Wallasey105 spills, 1,273 hours in 2025
2.0 km away
United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton164 spills, 769 hours in 2025
1.2 km away
United Utilities
Liverpool Wwtwinto Mersey Estuary · near bathing water: Wallasey118 spills, 563 hours in 2025
1.4 km away
United Utilities
Liverpool Wwtwinto Mersey Estuary · near bathing water: Wallasey60 spills, 434 hours in 2025
1.4 km away
United Utilities
Birkenhead Wwtw Birkeinto River Birket (Great Culvert - Downstream Length) · near bathing water: Moreton; Wallasey41 spills, 226 hours in 2025
2.0 km away
United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton48 spills, 139 hours in 2025
1.2 km away
United Utilities
Beacons Gutter Ssointo Mersey Estuary · near bathing water: Wallasey10 spills, 4 hours in 2025
1.5 km away
United Utilities
St Nicholas Storm Sewer Overflowinto Mersey Estuary · near bathing water: Wallasey7 spills, 3 hours in 2025
55 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
Rooftop solar
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022 400 m away
Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026 1.2 km away
Rooftop solar
Sainsburys, Jennifer Avenue - Solar panelsApproved, not yet built · 450 kW
Aug 2023 1.7 km away
Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024 2.0 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 2.0 km away
Rooftop solar
Steel Terminal, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 2.3 km away
Rooftop solar
North Liverpool Academy, Heyworth Street - Solar PV ArrayPlanning application in · 210 kW
Jul 2025 2.3 km away
Rooftop solar
Bulk Powder Terminals, Regent Road - Solar PanelsApproved, not yet built · 700 kW
Feb 2024 2.3 km away
Rooftop solar
Waste Care, Lower Bank View - Solar PanelsApproved, not yet built · 210 kW
Feb 2025 2.8 km away
Rooftop solar
Temp Control Building - Solar PanelsApproved, not yet built
Mar 2024 3.0 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
Major, planned
New Quay, LiverpoolSection 50 · LIVERPOOL CITY COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026 550 m away
Major
New Quay, LiverpoolSection 50 · LIVERPOOL CITY COUNCIL · No carriageway incursion
Sept 2026 to Oct 2026 550 m away
Major
Vauxhall Road, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Dec 2026 to Mar 2028 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
School closed: Rotunda Independent School for ExcellentOther independent school, other independent school (closure)
Jan 2021 1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 21 postcodes nearby had new homes completed in the last two years.
Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 3.2 km away
Wind farm
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 3.2 km away
Running nearest: Burbo Bank Energy Storage (battery storage, 3.7 km); Port of Liverpool - wind (wind farm, 3.9 km); Land at Carnegie Road (battery storage, 4.8 km); Lister Drive (battery storage, 4.8 km); Liverpool Energy Management Facility (battery storage, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 21.8 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 27.6 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.