Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
United Utilities
Huyton Farm Pumping Stationinto Un-Named Trib. Of River Alt0 spills, 0 hours in 2025
69 planned, approved or being built and 5 running (131 MW between them). Those within 5 km are on the map above.
Rooftop solar
Earlsfield Park, Arley Drive - Solar PanelsPlanning application in · 150 kW
Jan 2025 2.7 km away
Rooftop solar
Alder Hey Hospital, East Prescot Road - Solar PV ArrayApproved, not yet built · 470 kW
Mar 2026 2.7 km away
Rooftop solar
Sainsburys Supermarket, East Prescot Road - Solar PanelsApproved, not yet built · 460 kW
Jun 2025 2.9 km away
Rooftop solar
Peter Gilding And Company, Caddick Road - Solar PanelsApproved, not yet built · 470 kW
Dec 2024 2.9 km away
Rooftop solar
Adlib House, Kitling Road - Solar PanelsApproved, not yet built · 240 kW
Sept 2023 3.1 km away
Rooftop solar
Dixons Croxteth Academy, Carr Lane East - Solar PanelsApproved, not yet built · 170 kW
Oct 2025 3.2 km away
Rooftop solar
Beverston Engineering, Unit B - Solar PanelsApproved, not yet built · 200 kW
Sept 2025 3.5 km away
Rooftop solar
Penrhyn Court, Penrhyn Road - Solar PanelsApproved, not yet built · 260 kW
Feb 2026 3.5 km away
Rooftop solar
The Big Yellow Self Storage, Mill Lane - Solar ArrayApproved, not yet built · 170 kW
May 2023 4.0 km away
Rooftop solar
D H L Exel Supply Chain Burton Foods, Portal Way - Solar PanelsPlanning application in · 1 MW
Jun 20234.0 km away
Road and street works within 1 km
20 permitted works running now or planned, 7 of them major.
Major, planned
Gainford Road, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 550 m away
Major
Round Hey, Stockbridge VillageUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Feb 2027 to Mar 2027 650 m away
Major
Pool Hey, Stockbridge VillageUtility asset works · CADENT GAS LIMITED · Multi-way signals
Feb 2027 to Apr 2027 750 m away
Major, planned
Stockbridge Lane, HuytonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jan 2027 to Jan 2027 900 m away
Major
Stockbridge Lane, HuytonUtility asset works · CADENT GAS LIMITED · No carriageway incursion
Jan 2027 to Jan 2027 900 m away
Major, planned
Park Way, HuytonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jan 2027 to Jan 2027 1000 m away
Major
Park Way, HuytonUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Jan 2027 to Jan 2027 1000 m away
Standard
Cremorne Hey, Stockbridge VillageUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Feb 2027 to Feb 2027 0 m away
Standard
The Withens, Stockbridge VillageUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Feb 2027 to Feb 2027 250 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Lister Battery Limited - Battery Energy Storage SystemApproved, not yet built · 6 MW
Apr 2025 4.1 km away
Battery storage
Coopers Lane, Kirkby - Battery Storage FacilityApproved, not yet built · 50 MW
Apr 2024 4.1 km away
Running nearest: Lister Drive (battery storage, 4.3 km); Liverpool Energy Management Facility (battery storage, 4.3 km); Land at Carnegie Road (battery storage, 4.3 km); IBL Cold Stores - Solar Photovoltaics Panels (rooftop solar, 6.1 km); Port of Liverpool - wind (wind farm, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Snowberry Road, LiverpoolRemedial works · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away
Standard
Waterpark Drive, Stockbridge VillageUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Feb 2027 to Mar 2027 450 m away
Standard
Marled Hey, Stockbridge VillageUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Feb 2027 to Mar 2027 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
decided Sept 2014 22.4 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 27.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.