Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
752hours of spills in 2025 between them (typical neighbourhood: about 36)
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
application due January 2028 12.4 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 17.4 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 25.6 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.