Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
210hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
United Utilities
Woolton Stwinto Halewood Brook18 spills, 206 hours in 2025
2.0 km away
United Utilities
Woolton Stwinto Halewood Brook5 spills, 4 hours in 2025
45 planned, approved or being built and 9 running (252 MW between them). Those within 5 km are on the map above.
Battery storage
Leisure United Simpson - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025 1.7 km away
Rooftop solar
Self Storage Liverpool South, Goodlass Road - Solar PanelsApproved, not yet built · 170 kW
Jun 2025 2.7 km away
Rooftop solar
Halewood Leisure Centre, Baileys Lane - Solar PanelsApproved, not yet built · 320 kW
Aug 2024 2.8 km away
Rooftop solar
Halewood Leisure Centre, Baileys Lane - Solar PanelsApproved, not yet built · 330 kW
Nov 2024 2.8 km away
Rooftop solar
Renaissance Way - Plot 7 Solar PV ArrayApproved, not yet built
Dec 2023 3.1 km away
Rooftop solar
Jaguar Land Rover Jaguar Plant, North Road - Solar PanelsApproved, not yet built · 9 MW
Feb 2025 3.3 km away
Solar farm
Jaguar Land Rover, North Road - Ground Mounted Solar PanelsApproved, not yet built
Mar 2025 3.3 km away
Solar farm
Ford Halewood Transmissions Spekere, Boulevard - Solar ArrayApproved, not yet built · 1 MW
Dec 2023 3.4 km away
Battery storage
Speke Hall Avenue - Battery Energy Storage SystemApproved, not yet built
Feb 2025 3.9 km away
Rooftop solar
Estuary Boulevard - Solar PanelsApproved, not yet built · 620 kW
Mar 20243.9 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major, planned
North Linkside Road, LiverpoolDisconnection or alteration of supply · United Utilities Water Ltd · Road closure
Dec 2026 to Dec 2026 750 m away
Standard
Manor Road, LiverpoolDisconnection or alteration of supply · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
Minor
Lyndor Road, LiverpoolDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
application due January 2028 10.4 km away
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 19.3 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Woolton: +45% over five years (2020 → 2025).
Council tax list: 30 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 28.4 km away