What's changing near L25 5JE
Within 2 km, around Woolton in Liverpool. Building, planning, schools, transport, prices and crime.
59new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+13.2%like-for-like prices in Woolton, 2024 → 2025 (council +6.3%)
-21%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedhouses · Jul 2026
Jul 2026
1.5 km away - New homes
9 new homes completedhouses · Feb 2026 – Apr 2026
Apr 2026
1.9 km away - New homes
32 new homes completedflats · Jan 2025
Jan 2025
500 m away - New school
New school: Gateacre SchoolAcademy sponsor led, secondary
Dec 2024
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
20homes extended 2021–2025, typically adding 28 m²
35since energy certificates began (2008)
1in L25 5JE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
43 planned, approved or being built and 9 running (252 MW between them). Those within 5 km are on the map above.
- Battery storage
Leisure United Simpson - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025
1.4 km away - Rooftop solar
Self Storage Liverpool South, Goodlass Road - Solar PanelsApproved, not yet built · 170 kW
Jun 2025
2.4 km away - Rooftop solar
Renaissance Way - Plot 7 Solar PV ArrayApproved, not yet built
Dec 2023
3.2 km away - Rooftop solar
Halewood Leisure Centre, Baileys Lane - Solar PanelsApproved, not yet built · 320 kW
Aug 2024
3.3 km away - Rooftop solar
Halewood Leisure Centre, Baileys Lane - Solar PanelsApproved, not yet built · 330 kW
Nov 2024
3.3 km away - Rooftop solar
Jaguar Land Rover Jaguar Plant, North Road - Solar PanelsApproved, not yet built · 9 MW
Feb 2025
3.5 km away - Solar farm
Jaguar Land Rover, North Road - Ground Mounted Solar PanelsApproved, not yet built
Mar 2025
3.5 km away - Rooftop solar
Estuary Boulevard - Solar PanelsApproved, not yet built · 620 kW
Mar 2024
3.6 km away - Battery storage
Speke Hall Avenue - Battery Energy Storage SystemApproved, not yet built
Feb 2025
3.6 km away - Solar farm
Ford Halewood Transmissions Spekere, Boulevard - Solar ArrayApproved, not yet built · 1 MW
Dec 20233.8 km away
Road and street works within 1 km
4 permitted works running now or planned, 1 of them major.
- Major
Menlove Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Nov 2026 to Nov 2026
550 m away - Standard
Manor Road, LiverpoolDisconnection or alteration of supply · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Lyndor Road, LiverpoolDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026
750 m away - Minor
Woolton Hill Road, LiverpoolPermanent reinstatement · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
9.8 km away - Pre-applicationapplication due April 2027
11.9 km away - Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025
12.0 km away - Decideddecided May 2015
18.7 km away - Pre-applicationapplication due Dec 2027
19.8 km away - Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lister Drive (battery storage, 6.3 km); Liverpool Energy Management Facility (battery storage, 6.3 km); Land at Carnegie Road (battery storage, 6.3 km); Bromborough Dock Landfill Scheme (landfill gas, 7.7 km); Bromborough Dock (landfill gas, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.