Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
47 planned, approved or being built and 7 running (152 MW between them). Those within 5 km are on the map above.
Battery storage
Leisure United Simpson - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025 2.5 km away
Rooftop solar
Self Storage Liverpool South, Goodlass Road - Solar PanelsApproved, not yet built · 170 kW
Jun 2025 3.5 km away
Rooftop solar
Halewood Leisure Centre, Baileys Lane - Solar PanelsApproved, not yet built · 320 kW
Aug 2024 3.8 km away
Rooftop solar
Halewood Leisure Centre, Baileys Lane - Solar PanelsApproved, not yet built · 330 kW
Nov 2024 3.8 km away
Rooftop solar
Sainsburys Supermarket, East Prescot Road - Solar PanelsApproved, not yet built · 460 kW
Jun 2025 3.9 km away
Rooftop solar
Renaissance Way - Plot 7 Solar PV ArrayApproved, not yet built
Dec 2023 4.2 km away
Rooftop solar
The Big Yellow Self Storage, Mill Lane - Solar ArrayApproved, not yet built · 170 kW
May 2023 4.3 km away
Rooftop solar
Alder Hey Hospital, East Prescot Road - Solar PV ArrayApproved, not yet built · 470 kW
Mar 2026 4.3 km away
Rooftop solar
Jaguar Land Rover Jaguar Plant, North Road - Solar PanelsApproved, not yet built · 9 MW
Feb 2025 4.4 km away
Solar farm
Jaguar Land Rover, North Road - Ground Mounted Solar PanelsApproved, not yet built
Mar 20254.4 km away
Road and street works within 1 km
5 permitted works running now or planned.
Standard
Grange Way, LiverpoolDisconnection or alteration of supply · MANWEB · Give and take
Oct 2026 to Oct 2026 250 m away
Standard
Vyner Road North, LiverpoolHighway repair and maintenance works · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away
Standard
Vyner Road North, LiverpoolUtility repair and maintenance works · MANWEB · Give and take
Oct 2026 to Oct 2026 400 m away
Standard
Downham Way, LiverpoolDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 800 m away
Minor
Woolton Hill Road, LiverpoolPermanent reinstatement · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
application due January 2028 9.5 km away
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 19.9 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Gateacre: +29% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.0% in two years.
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 29.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.