Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
A5036 From J A567 Roundabout To J A565 Sw, SeftonWorks for Rail Purposes · NETWORK RAIL · Road closure
Nov 2026 to Nov 2026 700 m away
Major
Woolfall Terrace, SeaforthUtility asset works · SEFTON METROPOLITAN BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
Major, planned
A5036 From J A565 To J A567 Roundabout Ne, SeftonWorks for Rail Purposes · NETWORK RAIL · Road closure
Nov 2026 to Nov 2026 700 m away
Major, planned
Seaforth Road, SeaforthUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Oct 2026 to Nov 2026 850 m away
Major, planned
Springwell Road, BootleUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Dec 2026 to Dec 2026 900 m away
Major
Springwell Road, BootleUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Dec 2026 to Dec 2026 900 m away
Standard
Alpha Street, LitherlandHighway repair and maintenance works · SEFTON METROPOLITAN BOROUGH COUNCIL · Two-way signals
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Rubies 2 Building, Royal Seaforth Dock - Solar Panels
Approved, not yet built
Feb 2024 1.5 km away
Rooftop solar
Royal Seaforth Dock, New Jenkins Sheds - Solar PanelsApproved, not yet built · 2 MW
Feb 2024 1.5 km away
Running nearest: Port of Liverpool - wind (wind farm, 1.5 km); Royal Seaforth Dock Wind Farm (wind farm, 2.7 km); Land at Carnegie Road (battery storage, 6.7 km); Lister Drive (battery storage, 6.7 km); Liverpool Energy Management Facility (battery storage, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Nov 2026 to Nov 2026 200 m away
Standard
Mildmay Road, BootleHighway repair and maintenance works · SEFTON METROPOLITAN BOROUGH COUNCIL · Two-way signals
Oct 2026 to Oct 2026 300 m away
Standard
Knowsley Road, BootleUtility repair and maintenance works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away
Standard
Peel Road, BootleUtility asset works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 26.9 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 27.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.