Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
68 planned, approved or being built and 8 running (138 MW between them). Those within 5 km are on the map above.
Battery storage
Hawthorne RoadBeing built · 20 MW
Mar 2022 950 m away
Rooftop solar
Multiuser 5 Building, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 1.9 km away
Rooftop solar
Multiuser 4 Building - Solar PanelsApproved, not yet built
Feb 2024 1.9 km away
Rooftop solar
Multiuser 1 Building, Regent Road - Solar PanelsApproved, not yet built
Feb 2024 1.9 km away
Rooftop solar
Royal Seaforth Dock, New Jenkins Sheds - Solar PanelsApproved, not yet built · 310 kW
Feb 2024 1.9 km away
Rooftop solar
Multiuser 2 Building, Regent Road - Solar PanelsApproved, not yet built
Feb 2024 2.1 km away
Rooftop solar
Royal Seaforth Dock - Solar PanelsApproved, not yet built
Feb 2024 2.1 km away
Rooftop solar
Waste Care, Lower Bank View - Solar PanelsApproved, not yet built · 210 kW
Feb 2025 2.2 km away
Rooftop solar
Cwt Maintenance Building, Regent Road - Solar PanelsApproved, not yet built
Feb 2024 2.4 km away
Rooftop solar
Steel Terminal, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 2.6 km away
Rooftop solar
Road and street works within 1 km
6 permitted works running now or planned, 4 of them major.
Major, planned
Stuart Road, LiverpoolUtility repair and maintenance works · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away
Major, planned
Breeze Lane, LiverpoolUtility repair and maintenance works · MANWEB · Some carriageway incursion
Sept 2026 to Oct 2026 600 m away
Major, planned
Northfield Road, BootleUtility asset works · BT · Road closure
Nov 2026 to Nov 2026 850 m away
Major
Northfield Road, BootleUtility asset works · BT · Road closure
Nov 2026 to Nov 2026 850 m away
Standard
Dove Road, LiverpoolDisconnection or alteration of supply · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away
Minor
Fernhill Road, BootleDisconnection or alteration of supply · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Temp Control Building - Solar PanelsApproved, not yet built
Mar 2024 2.7 km away
Running nearest: Port of Liverpool - wind (wind farm, 2.0 km); Royal Seaforth Dock Wind Farm (wind farm, 4.4 km); Land at Carnegie Road (battery storage, 4.9 km); Lister Drive (battery storage, 4.9 km); Liverpool Energy Management Facility (battery storage, 4.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 25.7 km away
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 26.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.