Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Breeze Lane, LiverpoolUtility repair and maintenance works · MANWEB · Some carriageway incursion
Sept 2026 to Oct 2026 950 m away
Standard
Dove Road, LiverpoolDisconnection or alteration of supply · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 1000 m away
Minor
Fernhill Road, BootleDisconnection or alteration of supply · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Bulk Powder Terminals, Regent Road - Solar PanelsApproved, not yet built · 700 kW
Feb 2024 2.6 km away
Running nearest: Port of Liverpool - wind (wind farm, 1.7 km); Royal Seaforth Dock Wind Farm (wind farm, 4.0 km); Land at Carnegie Road (battery storage, 5.3 km); Lister Drive (battery storage, 5.3 km); Liverpool Energy Management Facility (battery storage, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 26.1 km away
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 26.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.