Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
200hours of spills in 2025 between them (typical neighbourhood: about 36)
68spill events counted
United Utilities
Southern Relief Csointo River Mersey Estuary46 spills, 159 hours in 2025
1.6 km away
United Utilities
Mersey Road Combined Sewer Overflowinto River Mersey Estuary12 spills, 24 hours in 2025
1.6 km away
United Utilities
Grassendale Combined Sewer Overflowinto River Mersey Estuary10 spills, 17 hours in 2025
42 planned, approved or being built and 5 running (127 MW between them). Those within 5 km are on the map above.
Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025 1.7 km away
Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021 2.6 km away
Battery storage
Leisure United Simpson - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025 3.0 km away
Rooftop solar
Self Storage Liverpool South, Goodlass Road - Solar PanelsApproved, not yet built · 170 kW
Jun 2025 3.3 km away
Rooftop solar
Tesco SuperstoreApproved, not yet built
Apr 2021 3.8 km away
Rooftop solar
Estuary Boulevard - Solar PanelsApproved, not yet built · 620 kW
Mar 2024 3.8 km away
Rooftop solar
Garston Shore Road - Solar PanelsApproved, not yet built · 470 kW
Sept 2022 3.9 km away
Battery storage
Speke Hall Avenue - Battery Energy Storage SystemApproved, not yet built
Feb 2025 4.4 km away
Rooftop solar
The Big Yellow Self Storage, Mill Lane - Solar ArrayApproved, not yet built · 170 kW
May 2023 4.5 km away
Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 5.0 km away
Wind farm
Road and street works within 1 km
28 permitted works running now or planned, 15 of them major.
Major
Brodie Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Multi-way signals
Aug 2026 to Apr 2027 200 m away
Major, planned
Brodie Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Nov 2026 to Apr 2027 200 m away
Major
Brodie Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Nov 2026 to Apr 2027 200 m away
Major, planned
Brodie Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Dec 2026 to Dec 2026 200 m away
Major
Brodie Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Nov 2026 to Nov 2026 200 m away
Major, planned
Brodie Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Apr 2027 to Apr 2027 200 m away
Major
Brodie Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Road closure
Apr 2027 to Apr 2027 200 m away
Major, planned
North Sudley Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
Major
North Sudley Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 700 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 5.0 km away
Rooftop solar
Renaissance Way - Plot 7 Solar PV ArrayApproved, not yet built
Dec 2023 5.1 km away
Running nearest: Bromborough Dock Landfill Scheme (landfill gas, 4.7 km); Bromborough Dock (landfill gas, 5.1 km); Lister Drive (battery storage, 5.6 km); Liverpool Energy Management Facility (battery storage, 5.6 km); Land at Carnegie Road (battery storage, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major, planned
Booker Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 750 m away
Major, planned
Eastcote Road, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 750 m away
Major, planned
Greenhill Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 23.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.