What's changing near L18 3JS
Within 2 km, around Calderstones in Liverpool. Building, planning, schools, transport, prices and crime.
58new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.4%like-for-like prices in Calderstones, 2024 → 2025 (council +6.3%)
+4%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
8 new homes completedflats · Jan 2026
Jan 2026
1.2 km away - New homes
5 new homes completedflats · Jan 2026
Jan 2026
1.3 km away - New homes
5 new homes completedflats · Dec 2025
Dec 2025
1.3 km away - New homes
32 new homes completedflats · Jan 2025
Jan 2025
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 73 m²
27since energy certificates began (2008)
1in L18 3JS itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
46 planned, approved or being built and 6 running (147 MW between them). Those within 5 km are on the map above.
- Battery storage
Leisure United Simpson - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025
2.4 km away - Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025
2.8 km away - Rooftop solar
Self Storage Liverpool South, Goodlass Road - Solar PanelsApproved, not yet built · 170 kW
Jun 2025
3.0 km away - Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021
3.5 km away - Rooftop solar
Estuary Boulevard - Solar PanelsApproved, not yet built · 620 kW
Mar 2024
3.9 km away - Rooftop solar
Garston Shore Road - Solar PanelsApproved, not yet built · 470 kW
Sept 2022
4.0 km away - Rooftop solar
The Big Yellow Self Storage, Mill Lane - Solar ArrayApproved, not yet built · 170 kW
May 2023
4.1 km away - Battery storage
Speke Hall Avenue - Battery Energy Storage SystemApproved, not yet built
Feb 2025
4.3 km away - Rooftop solar
Sainsburys Supermarket, East Prescot Road - Solar PanelsApproved, not yet built · 460 kW
Jun 2025
4.4 km away - Rooftop solar
Renaissance Way - Plot 7 Solar PV ArrayApproved, not yet built
Dec 2023
4.5 km away
Road and street works within 1 km
14 permitted works running now or planned, 10 of them major.
- Major, planned
Booker Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026
100 m away - Major, planned
Booker Avenue, LiverpoolUtility asset works · CADENT GAS LIMITED · Road closure
Apr 2027 to Jun 2027
150 m away - Major, planned
Keswick Road, LiverpoolUtility asset works · CADENT GAS LIMITED · Road closure
Apr 2027 to Jun 2027
150 m away - Major
Glenside, LiverpoolNew service connection · MANWEB · Road closure
Oct 2026 to Oct 2026
250 m away - Major, planned
Greenhill Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major
Greenhill Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major, planned
Booker Avenue, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026
550 m away - Major, planned
Mather Avenue, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Lane closure
Sept 2026 to Oct 2026
650 m away - Major
Mather Avenue, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Lane closure
Sept 2026 to Oct 2026
650 m away
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
8.0 km away - Pre-applicationapplication due April 2027
12.4 km away - Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025
13.5 km away - Decideddecided May 2015
19.2 km away - Decisionapplication due Q3 2025
20.3 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lister Drive (battery storage, 5.3 km); Liverpool Energy Management Facility (battery storage, 5.3 km); Land at Carnegie Road (battery storage, 5.3 km); Bromborough Dock Landfill Scheme (landfill gas, 5.9 km); Bromborough Dock (landfill gas, 6.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.