What's changing near L17 0AA
Within 2 km, around Mossley Hill West & Sefton Park in Liverpool. Building, planning, schools, transport, prices and crime.
92new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.9%like-for-like prices in Mossley Hill West & Sefton Park, 2024 → 2025 (council +6.3%)
+41%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
8 new homes completedflats · Apr 2026
Apr 2026
1.5 km away - New homes
8 new homes completedflats · Jan 2026
Jan 2026
1.5 km away - New homes
5 new homes completedflats · Jan 2026
Jan 2026
1.5 km away - New homes
5 new homes completedflats · Dec 2025
Dec 2025
1.5 km away - New homes
13 new homes completedflats · Jun 2025
Jun 2025
1.6 km away - New homes
39 new homes completedflats · Feb 2025
Feb 2025
1.8 km away - New homes
6 new homes completedflats · Jan 2025
Jan 2025
1.9 km away - New homes
6 new homes completedflats · Dec 2024
Dec 2024
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
21homes extended 2021–2025, typically adding 24 m²
39since energy certificates began (2008)
3in L17 0AA itself
- Extendedcertificate 2022
- Extendedcertificate 2016
- Extendedcertificate 2011
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
244hours of spills in 2025 between them (typical neighbourhood: about 36)
88spill events counted
- United Utilities
Southern Relief Csointo River Mersey Estuary46 spills, 159 hours in 2025
1.3 km away - United Utilities
Mersey Road Combined Sewer Overflowinto River Mersey Estuary12 spills, 24 hours in 2025
1.1 km away - United Utilities
Windbourne Csointo Mersey Estuary · near bathing water: Wallasey7 spills, 20 hours in 2025
1.4 km away - United Utilities
Jericho Lane Csointo Mersey Estuary · near bathing water: Wallasey6 spills, 20 hours in 2025
1000 m away - United Utilities
Grassendale Combined Sewer Overflowinto River Mersey Estuary10 spills, 17 hours in 2025
1.6 km away - United Utilities
Fulwood Csointo River Mersey Estuary · near bathing water: Wallasey7 spills, 5 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
45 planned, approved or being built and 6 running (129 MW between them). Those within 5 km are on the map above.
- Battery storage
Leisure United Jericho Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Aug 2025
550 m away - Rooftop solar
Aigburth Park - Solar PanelsApproved, not yet built
May 2021
1.5 km away - Rooftop solar
Tesco SuperstoreApproved, not yet built
Apr 2021
2.8 km away - Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022
3.9 km away - Wind farm
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022
3.9 km away - Battery storage
Leisure United Simpson - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025
4.2 km away - Rooftop solar
Self Storage Liverpool South, Goodlass Road - Solar PanelsApproved, not yet built · 170 kW
Jun 2025
4.4 km away - Battery storage
Biffa Waste Services, Dock Road South - Battery Storage UnitsApproved, not yet built
Dec 2022
4.4 km away - Rooftop solar
Garston Shore Road - Solar PanelsApproved, not yet built · 470 kW
Sept 2022
4.6 km away - Rooftop solar
The Big Yellow Self Storage, Mill Lane - Solar ArrayApproved, not yet built · 170 kW
May 2023
4.6 km away
Road and street works within 1 km
8 permitted works running now or planned, 4 of them major.
- Major, planned
North Sudley Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major
North Sudley Road, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major, planned
Hailsham Road, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Nov 2026 to Nov 2026
550 m away - Major
Hailsham Road, LiverpoolUtility repair and maintenance works · MANWEB · Road closure
Nov 2026 to Nov 2026
550 m away - Standard
Aigburth Road, LiverpoolNew service connection · MANWEB · Lane closure
Oct 2026 to Oct 2026
100 m away - Standard
Elmswood Road Pt 1, LiverpoolUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away - Standard
Chequers Gardens, LiverpoolUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away - Standard
Mersey Road, LiverpoolUtility repair and maintenance works · MANWEB · Multi-way signals
Nov 2026 to Nov 2026
550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
6.5 km away - Pre-applicationapplication due April 2027
12.8 km away - Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester application due 30 May 2025
15.0 km away - Decisionapplication due Q3 2025
18.5 km away - Decideddecided Mar 2024
19.8 km away - Decideddecided May 201520.5 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Bromborough Dock Landfill Scheme (landfill gas, 3.7 km); Bromborough Dock (landfill gas, 4.2 km); Lister Drive (battery storage, 5.5 km); Liverpool Energy Management Facility (battery storage, 5.5 km); Land at Carnegie Road (battery storage, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.