Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
71 planned, approved or being built and 8 running (139 MW between them). Those within 5 km are on the map above.
Rooftop solar
Alder Hey Hospital, East Prescot Road - Solar PV ArrayApproved, not yet built · 470 kW
Mar 2026 700 m away
Battery storage
Lister Battery Limited - Battery Energy Storage SystemApproved, not yet built · 6 MW
Apr 2025 750 m away
Rooftop solar
The Big Yellow Self Storage, Mill Lane - Solar ArrayApproved, not yet built · 170 kW
May 2023 750 m away
Rooftop solar
Sainsburys Supermarket, East Prescot Road - Solar PanelsApproved, not yet built · 460 kW
Jun 2025 800 m away
Rooftop solar
Stanley Meat Market, Prescot Road - Solar PV SystemsApproved, not yet built · 300 kW
Jul 2024 1.1 km away
Rooftop solar
Dixons Croxteth Academy, Carr Lane East - Solar PanelsApproved, not yet built · 170 kW
Oct 2025 3.4 km away
Rooftop solar
North Liverpool Academy, Heyworth Street - Solar PV ArrayPlanning application in · 210 kW
Jul 2025 4.0 km away
Battery storage
Jeffrey Humble Playing Fields, Long Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Sept 2025 4.5 km away
Rooftop solar
Sainsburys, Jennifer Avenue - Solar panelsApproved, not yet built · 450 kW
Aug 2023 4.7 km away
Rooftop solar
Tesco SuperstoreApproved, not yet built
Apr 20215.1 km away
Road and street works within 1 km
24 permitted works running now or planned, 5 of them major.
Major, planned
Fitzgerald Road, LiverpoolHighway improvement works · LIVERPOOL CITY COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 350 m away
Major, planned
West Oakhill Park, LiverpoolDisconnection or alteration of supply · United Utilities Water Ltd · Road closure
Dec 2026 to Dec 2026 700 m away
Major, planned
Edge Lane Drive, LiverpoolHighway repair and maintenance works · LIVERPOOL CITY COUNCIL · Road closure
Nov 2026 to Nov 2026 900 m away
Major, planned
Kremlin Drive, LiverpoolUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Dec 2026 to Jan 2027 950 m away
Major
Kremlin Drive, LiverpoolUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Dec 2026 to Jan 2027 950 m away
Standard
Acanthus Road, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 150 m away
Standard
Acanthus Road, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 200 m away
Standard
Abacus Road, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 250 m away
Standard
Woodhall Road, LiverpoolUtility repair and maintenance works · United Utilities Water Ltd · Some carriageway incursion
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Stoneycroft: +39% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.4% in two years.
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 24.4 km away
Decided
HyNet Carbon Dioxide PipelineOther Pipe-lines · From the Ince AGI in Cheshire, via Stanlow Refinery, to Talacre Beach in North Wales
decided Mar 2024 24.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.